Circle Line (Singapore)

Circle Line
An Alstom Metropolis C851E trainset at HarbourFront station, bound for Dhoby Ghaut in the clockwise direction.
Overview
Native nameMalay: Laluan MRT Circle
Chinese: 地铁环线
Tamil: இணைப்பு எம்ஆர்டி வழி
StatusOperational
OwnerLand Transport Authority
LocaleSingapore
TerminiDhoby Ghaut, Prince Edward Road
Stations33
Colour on map     Orange (#fa9e0d)
Service
TypeRapid transit
Light metro
SystemMass Rapid Transit (Singapore)
Services3
OperatorSMRT Trains (SMRT Corporation)
DepotKim Chuan
Rolling stockAlstom Metropolis C830
Alstom Metropolis C830C
Alstom Metropolis C851E
Daily ridership450,000 (2023)
History
Opened28 May 2009 (2009-05-28) (Stage 3)
17 April 2010 (2010-04-17) (Stages 1 and 2)
8 October 2011 (2011-10-08) (Stages 4 and 5)
14 January 2012 (2012-01-14) (Circle Line Extension)
12 July 2026 (2026-07-12) (Stage 6)
Technical
Line length39.5 km (24.5 mi)
Track length39.5 km (24.5 mi)
CharacterFully underground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Operating speedlimit of 78 km/h (48 mph)
Maps
 CC16 
Marymount
 NS17 
Bishan
 CC15 
 CC17  TE9 
Caldecott
Lorong Chuan
 CC14 
Bukit Brown
(future station)
Serangoon
 CC13 
 NE12 
 DT9 
← to Bukit Panjang
to Expo →
■
Bartley
 CC12 
 CC19 
Botanic Gardens
 CC20 
Farrer Road
Tai Seng
 CC11 
 CC21 
Holland Village
 EW21 
■
← to Bukit Panjang
to Expo →
 DT26 
 CC22 
Buona Vista
MacPherson
 CC10 
 CC23 
one-north
 EW8 
 CC24 
Kent Ridge
Paya Lebar
 CC9 
 CC25 
Haw Par Villa
 CC26 
Pasir Panjang
Dakota
 CC8 
 CC27 
Labrador Park
Mountbatten
 CC7 
 CC28 
Telok Blangah
Stadium
 CC6 
 NE1 
Nicoll Highway
 CC5 
 CC29 
HarbourFront
 NE6 
Dhoby Ghaut
 CC1 
 NS24 
Bras Basah
 CC2 
 CC30 
Keppel
Esplanade
 CC3 
Promenade
 DT15  CC4 
 CC31 
Cantonment
Bayfront
 DT16  CC34 
Marina Bay
 NS27  CC33 
 CC32 
Prince Edward
Road
 TE20 

The Circle Line (CCL) is a rail line on the Singapore Mass Rapid Transit (MRT) system. Operated by SMRT trains, it runs in a loop mostly within the Central Region of the country, with a spur running from Dhoby Ghaut to Promenade. Coloured orange on the rail map, the fully underground line is 39.5 km (24.5 mi) long with 33 stations.

The CCL was initially conceived in the 1990s as the Marina Line, a light rail system linking the National Stadium, Shenton Way, and Marina South. An outer circle line, connecting Buona Vista and Paya Lebar via Bishan and Serangoon, was also proposed. In April 2001, it was announced that the section of the Marina Line between Dhoby Ghaut and Stadium would be built as the first stage of the CCL, comprising a loop extending to Marina South via World Trade Centre. Work began in 2002, but the Nicoll Highway collapse delayed the expected completion date of CCL Stage 1 from 2007 to 2009.

Stage 3, which spans between Bartley and Marymount, opened on 28 May 2009. The completion of Stages 1 and 2 on 17 April 2010 extended the CCL to Dhoby Ghaut. The line was extended to HarbourFront on 8 October 2011 with the opening of Stages 4 and 5. A two-station extension to Marina Bay was inaugurated on 14 January 2012. Stage 6, the final section connecting HarbourFront and Marina Bay via Keppel, Cantonment and Prince Edward Road, opened on 12 July 2026.

The CCL is Singapore's first medium-capacity rail line, and utilises three types of Alstom rolling stock – C830, C830C and C851E – all of which runs in a three-car formation. The line is fully automated and uses Alstom's Urbalis 300 Communications Based Train Control (CBTC) signalling system. Several artworks are displayed on all stations of the line as part of the Art in Transit programme.