Jurong East MRT station

Jurong East
 NS1  EW24  JE5 
裕廊东
ஜூரோங் கிழக்கு
Platform E of Jurong East
General information
Location10 Jurong East Street 12, Singapore 609690
Coordinates01°20′00″N 103°44′32″E / 1.33333°N 103.74222°E / 1.33333; 103.74222
SystemMass Rapid Transit (MRT) interchange and terminus
OwnerLand Transport Authority
OperatorSMRT Trains (North–South and East–West Lines)
Singapore One Rail (Jurong Region Line)
Line
Platforms6 (3 island platforms) + 2 (2 stacked platforms) (U/C)
Tracks4 + 2 (U/C)
Connections Jurong East
Jurong Town Hall
Construction
Structure type
Elevated
Platform levels
1 + 1 (U/C)
ParkingYes (Jem, Westgate)
Cycle facilities
Yes
AccessibleYes
Other information
Station codeJUR
History
Opened5 November 1988 (1988-11-05) (Platforms C to F)
27 May 2011 (2011-05-27) (Platforms A & B)
Opening2028 (2028) (Jurong Region Line)
Former namesJurong, Jurong Town
Passengers
June 202464,034 per day
Services
Preceding station Mass Rapid Transit Following station
Terminus North–South Line Bukit Batok
Clementi
towards Pasir Ris
East–West Line Chinese Garden
towards Tuas Link
Toh Guan
towards Tengah
Jurong Region Line
Future service
Jurong Town Hall
Former services
Preceding station Mass Rapid Transit Following station
Terminus Branch Line Bukit Batok
Location
Jurong East is located in Singapore Rail
Jurong East
Jurong East
Location within Singapore Rail

Jurong East MRT station is an elevated Mass Rapid Transit (MRT) interchange station on the North–South (NSL) and East–West (EWL) lines in Jurong East, Singapore. Situated along Jurong Gateway Road, the station is located within the vicinity of Jem, Westgate, IMM, Ng Teng Fong General Hospital, Jurong East Bus Interchange and Jurong Town Hall Bus Interchange. The station is operated by SMRT Trains.

The station opened on 5 November 1988 as part of the MRT extension to Lakeside. The station was the terminus of the Branch line which later merged into the NSL. Through the Jurong East Modification Project, an additional track and platform were built in 2011 to improve train frequencies on the NSL. In May 2018, it was announced that the station would be an interchange with the Jurong Region Line (JRL) when the second stage opens in 2028. The station is planned to be integrated into the Jurong East Integrated Transport Hub (JEITH) – an integrated civic, retail and commercial complex.