Kallang–Paya Lebar Expressway
| Lebuhraya Kallang-Paya Lebar (Malay) 加冷-巴耶利峇高速公路 (Chinese) கலாங்-பாயலேபார் விரைவுச்சாலை (Tamil) | |
![]() | |
| Route information | |
| Part of | |
| Length | 12 km (7.5 mi) |
| Existed | 2001–present |
| History | Completed in 2008 |
| Major junctions | |
| Southeast end | Kallang (ECP, MCE) |
| TPE, ORRS (Bartley Road East), PIE, ECP, MCE | |
| Northeast end | Hougang (TPE) |
| Location | |
| Country | Singapore |
| Regions | Hougang, Kallang, Geylang, Paya Lebar |
| Highway system | |
The Kallang–Paya Lebar Expressway (KPE) is the third newest of Singapore's network of expressways. The southern (Kallang) section of the expressway opened first, on 26 October 2007, with the remaining (Paya Lebar) section opening on 20 September 2008.
Connecting the East Coast Parkway (ECP) in the south to the Tampines Expressway (TPE) in the northeast, this six-lane (2x3) expressway spans over 12 kilometres (7.5 mi), featuring approximately 8.13 kilometres (5.05 mi) of main cut and cover tunnels. Built at a cost of roughly S$1.8 billion (USD1 billion), it stands as the longest subterranean road tunnel in Southeast Asia and was believed to be the world's sixth-longest underground road project during its construction.
In total, the dual-carriageway expressway features three lanes in each direction, supported by eight interchanges, 11 on-ramps and 12 off-ramps. The southern terminus of the KPE connects directly to the Marina Coastal Expressway (MCE), which opened on 29 December 2013. This extension added a further 4.33 kilometres (2.69 mi) of road tunnels, bringing the total continuous underground network to 12.46 kilometres (7.74 mi).
In 2015, the Land Transport Authority (LTA) awarded a contract to expand the KPE/TPE interchange and construct a new road connection to Punggol Central, aimed at alleviating congestion between the KPE and Punggol ramps. The project involved designing and building new roads, a flyover across the TPE, associated ramps and three new vehicular bridges crossing Sungei Serangoon and Sungei Blukar. Construction was executed in phases and fully completed in 2020.
%22%3E%3Ctext%20x%3D%2250%25%22%20y%3D%2250%25%22%20text-anchor%3D%22middle%22%20dominant-baseline%3D%22middle%22%20fill%3D%22%2354595d%22%20font-size%3D%2216%22%20font-family%3D%22sans-serif%22%3EKallang%E2%80%93Paya%20Lebar%20Expressway%2020260118%20182911.jpg%3C%2Ftext%3E%3C%2Fg%3E%3C%2Fsvg%3E)