Promenade MRT station

Promenade
 CC4  DT15 
宝门廊
புரொமனாட்
Exit A of Promenade station
General information
Location2 Temasek Avenue, Singapore 039193 (CCL)
10 Temasek Avenue, Singapore 039194 (DTL)
Coordinates01°17′33″N 103°51′39″E / 1.29250°N 103.86083°E / 1.29250; 103.86083
SystemMass Rapid Transit (MRT) interchange
OwnerLand Transport Authority
OperatorSMRT Trains (Circle Line)
SBS Transit (Downtown Line)
Line
Platforms4 (4 stacked platforms)
Tracks4
ConnectionsBus, Taxi
Construction
Structure type
Underground
Depth42 metres (138 ft)
Platform levels
4
AccessibleYes
Other information
Station codePMN
History
Opened17 April 2010 (2010-04-17) (Circle Line)
14 January 2012 (2012-01-14) (Circle Line Extension)
22 December 2013 (2013-12-22) (Downtown Line)
Former namesMillenia, Marina Centre, Sheares
Passengers
June 202419,478 per day
Services
Preceding station Mass Rapid Transit Following station
Bayfront
Clockwise
Circle Line Nicoll Highway
Anticlockwise
Esplanade
towards Dhoby Ghaut
Circle Line
Nicoll Highway
Bugis Downtown Line Bayfront
towards Expo
Location
Promenade is located in Singapore Rail central area
Promenade
Promenade
Location within Singapore Rail central area

Promenade MRT station is an underground Mass Rapid Transit (MRT) interchange station on the Downtown (DTL) and Circle (CCL) lines in Downtown Core, Singapore. Located underneath Temasek Avenue and adjacent to Millenia Tower, the station serves several key attractions and locations such as Suntec City and the Marina Promenade, which the station is named after. The station is at the junction of the Dhoby Ghaut and Marina Bay branches of the CCL.

The station was first announced as Millenia MRT station in 1999 and was part of the Marina Line, which later became CCL Stage 1. It was later announced in 2005 that the CCL would branch off from this station to serve Chinatown, which eventually became DTL Stage 1 in 2007. The station opened on 17 April 2010 as part of the CCL Stages 1 and 2. On 14 January 2012, the CCL branch to Marina Bay via Bayfront station opened. The DTL platforms opened on 22 December 2013 as part of Downtown Line Stage 1. The DTL station is the second deepest station in the entire MRT network at 42 m (138 ft), behind Bencoolen station at 43 m (141 ft).