Alstom Metropolis C851E

Alstom Metropolis C851E
The interior of the NEL C851E
The interior of the CCL C851E
Stock typeElectric multiple unit
In service
  • 28 July 2023 (2023-07-28) – Present (NEL)
  • 13 April 2026 (2026-04-13) – Present (CCL)
ManufacturerAlstom
Built atBarcelona, Spain
Family nameMetropolis
Constructed
  • 2020 – 2023 (NEL)
  • 2021 – 2025 (CCL)
Entered service
  • 28 July 2023 (2023-07-28) (NEL)
  • 13 April 2026 (2026-04-13) (CCL)
Number built
  • 36 Vehicles (6 Sets) (NEL)
  • 69 Vehicles (23 Sets) (CCL)
Number in service
  • 36 Vehicles (6 Sets) (NEL)
  • 69 Vehicles (23 Sets) (CCL)
Formation6 per NEL trainset, 3 per CCL trainset
  • DT–Mp–Mi+Mi–Mp–DT (NEL)
  • Mc1–T–Mc2 (CCL)
Fleet numbers
  • 7087/7088 – 7097/7098 (NEL)
  • 865 – 887 (CCL)
Capacity
  • 1920 passengers (298 seats) (NEL)
  • 931 passengers (148 seats) (CCL)
Operators
Depots
Lines served
Specifications
Car body constructionWelded aluminium
Train length
  • 138.5 m (454 ft 4+3⁄4 in) (NEL)
  • 70.1 m (229 ft 11+7⁄8 in) (CCL)
Car length
  • 23.65 m (77 ft 7+1⁄8 in) (DT/Mc)
  • 22.8 m (74 ft 9+5⁄8 in) (Mp/Mi/T)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+5⁄8 in)
Doors1,450 mm (57+1⁄8 in), 8 per car, 4 per side
Maximum speed
  • 100 km/h (62 mph) (NEL design)
  • 90 km/h (56 mph) (NEL service, CCL design)
  • 78 km/h (48 mph) (CCL service)
Traction systemAlstom OPTONIX IGBT–VVVF
Acceleration0.95 m/s2 (3.1 ft/s2)
Deceleration1.3 m/s2 (4.3 ft/s2) (Emergency)
Electric systems
Current collection
UIC classification
  • 2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′ (NEL)
  • Bo′Bo′+2′2′+Bo′Bo′ (CCL)
Braking systemsRegenerative and pneumatic
Safety systemsAlstom URBALIS 300 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, Iconis ATS and Smartlock CBI
Coupling systemScharfenberg
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The Alstom Metropolis C851E is the third generation electric multiple unit rolling stock introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East Line trains and 23 Circle Line trains. The trains were manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL. The contract, valued at around S$250 million, was awarded by the Land Transport Authority (LTA) during a ceremony held at Sengkang Depot. Alstom was the sole bidder for this contract.