Cross Island Line

Cross Island Line
Construction works at Serangoon North station
Overview
Native nameMalay: Laluan MRT Rentas Pulau
Chinese: 跨岛地铁线
Tamil: குறுக்குத் தீவு ரயில் பாதை
Status
  • Under construction (Phase 1, 2 & Punggol Extension)
  • Under planning (Phase 3 & Changi Terminal 5)
OwnerLand Transport Authority
LocaleSingapore
Termini
Stations
  • 12 (Phase 1)
  • 6 (Phase 2)
  • 4 (Phase 3)
  • 1 (Changi Terminal 5)
  • 3 (Punggol Extension)
Color on map     Lime (#97C616)
Service
TypeRapid transit
SystemMass Rapid Transit (Singapore)
Services3
OperatorTBA
DepotChangi East
Rolling stockCRRC Qingdao Sifang CR151
History
Planned opening
  • 2030 (2030) (Phase 1)
  • 2032 (2032) (Phase 2 & Punggol Extension)
  • mid-2030 (2030)s (Changi Terminal 5)
  • late-2030 (2030)s (Phase 3)
Technical
Line length
  • 29 km (18 mi) (Phase 1)
  • 15 km (9.3 mi) (Phase 2)
  • 10 km (6.2 mi) (Phase 3)
  • 7.3 km (4.5 mi) (Punggol Extension)
  • 5.8 km (3.6 mi) (Changi Terminal 5)
  • 67 km (42 mi) (Total)
CharacterFully underground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 1,500 V DC
Maps
 CR1  TE32 
Changi Terminal 5
 CR2 
Aviation Park
 CR3 
Loyang
 CR4 
Pasir Ris East
 EW1 
 CP1   CR5 
Pasir Ris
Sungei Api Api
 CP2 
Elias
 CR6 
Tampines North
 CR7 
Defu
 PE4 
■
Punggol LRT
East Loop
 CP3 
Riviera
 PTC 
■
East Loop
West Loop
 NE17 
 CP4 
Punggol
 NE14 
 CR8 
Hougang
 CR9 
Serangoon North
 CR10 
Tavistock
 CR11 
Ang Mo Kio
 NS16 
 CR12 
Teck Ghee
 CR13 
Bright Hill
 TE7 
 CR14 
Turf City
 DT6 
■
← to Bukit Panjang
to Expo →
 CR15 
King Albert Park
 CR16 
Maju
Sungei Ulu Pandan
 CR17 
Clementi
 EW23 
■
← to Tuas Link
to Pasir Ris →
 CR18 
West Coast
 JE 
■
← to Tengah
to Kent Ridge →
Sungei Pandan
 CR19 
Jurong Lake District
Jurong Lake
 CR20 
CR20
 CR21 
Jurong Pier
 JS12 
Sungei Lanchar
 CR22 
CR22
 CR23 
Gul Circle
 EW30 
■
← to Pasir Ris
to Tuas Link →
Depot at Tuas

The Cross Island Line (CRL) is a high-capacity Mass Rapid Transit (MRT) line currently under construction in Singapore. It will run in an east–west direction across the planning areas of Changi to Pioneer, passing through Pasir Ris, Hougang, Serangoon, Ang Mo Kio, Bukit Timah, Clementi, Jurong East and Boon Lay. From Pasir Ris, a branch of the line will extend to Punggol. Once fully operational, the 67-kilometre (42 mi) line will replace the East–West Line (EWL) as the longest line on the MRT network, serving approximately 26 stations. It will utilise the CRRC Qingdao Sifang CR151 electric multiple unit (EMU), running in a six-car formation. However, to cater to future demand, stations on the line will be built to accommodate eight-car trains.

Plans for the CRL were first announced in 2013. It is envisioned to serve various key hubs including the Jurong Lake District and the Punggol Digital District, offering an alternative east–west connection to alleviate passenger load on the EWL. Shortly after the announcement, some nature groups called for the diversion of CRL tunnels away from the Central Catchment Nature Reserve (CCNR). Despite the calls, the government decided to continue with the original direct route in 2019, citing commuting time, economic factors and long-term energy consumption. The alignment and stations of Phase 1 were finalised in 2019, followed by the Punggol branch in 2020, Phase 2 in 2022, and Phase 3 in 2026. The proposed full line is expected to have a daily ridership of over one million in the long term, and to cost an estimated S$40.7 billion.