CRRC Qingdao Sifang CR151

CRRC Qingdao Sifang CR151
Exterior mockup of the CR151
Interior mockup of the CR151.
Stock typeElectric multiple unit
In service2030 (2030) (Projected)
ManufacturerCRRC Qingdao Sifang
Built atQingdao, Shandong, China
Constructed2025 – 2030
Entered service2030 (2030) (Projected)
Number under construction264 Vehicles (44 Sets)
Number built264 Vehicles (44 Sets)
Formation6/8 cars per trainset
DT–Mp–Mi+Mi–Mp–DT
Fleet numbers5001 – 5044
Capacity1920 passengers per 6-car train
DepotChangi East
Line served CRL  Cross Island Line
Specifications
Car body constructionWelded aluminium
Train length138.5 m (454 ft 4+3⁄4 in)
Car length
  • 23.65 m (77 ft 7+1⁄8 in) (DT)
  • 22.8 m (74 ft 9+5⁄8 in) (Mp/Mi)
Width3.2 m (10 ft 6 in)
Height3.7 m (12 ft 1+5⁄8 in)
Doors1,450 mm (57+1⁄8 in), 10 per car, 5 per side
Maximum speed
  • 100 km/h (62 mph) (design)
  • 90 km/h (56 mph) (service)
Electric systems1,500 V DC Overhead conductor rail
Current collectionPantograph
UIC classification2′2′+Bo′Bo′+Bo′Bo′+Bo′Bo′+Bo′Bo′+2′2′
Safety systemSiemens Trainguard Sirius moving block CBTC ATC under ATO GoA 4 (UTO)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The CRRC Qingdao Sifang CR151 is a type of electric multiple unit built for the Cross Island Line of Singapore's Mass Rapid Transit (MRT) system. The contract was awarded to CRRC Sifang, a consortium of CRRC Qingdao Sifang Company and Singapore CRRC Sifang Railway Vehicles Service. As of June 2023, the Land Transport Authority (LTA) has purchased 44 six-car trains. The first train was delivered in May 2026, with the rest to be progressively delivered before the opening of the line in 2030.