Circle Line (Kuala Lumpur)

MRT Circle Line
13
Rapid KL (brand)
Overview
Other nameMRT3, MRT Line 3
Native nameMRT Laluan Lingkaran
StatusLand acquisition in progress
OwnerMRT Corp
Line number13 (Blue violet)
LocaleKlang Valley
Termini
Stations33 (30 active, 3 provisional)
Websitewww.mymrt.com.my
Service
TypeRapid transit
SystemRapid KL (brand) Rapid KL
Klang Valley Integrated Transit System
ServicesCircle route
OperatorRapid Rail
Depot(s)Kampung Puah Depot
Taman Midah Depot
Rolling stock4-car i-MRT trainsets
Width: TBC - wide profile
Length: 74.86 m (245.6 ft)
History
Work began2027 (expected)
Planned opening2032 (expected)
Technical
Line length51.6 km (32.1 mi)
Elevated: 39.7 km (24.7 mi)
Underground: 11.9 km (7.4 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Conduction systemAutomated and driverless
Operating speed100 km/h (62 mph)
Route map

MRT3 Official Map
Line 13 - MRT Circle Line
Jalan Kuching
Titiwangsa
Dutamas
Kampung Puah
Taman Sri Sinar
Jalan Langkawi
Bukit Segambut
Kampung Puah Depot
Mont Kiara
Danau Kota
Sri Hartamas
Setapak
Rejang
Bukit Kiara
Bukit Kiara
Selatan
Setiawangsa
AU2
UM
Taman Hillview
Universiti
Tasik Ampang
Pantai Permai
Kampung Pandan
Pantai Dalam
Pandan Indah
Jalan Klang Lama
Taman Kencana
Kuchai
Taman Midah Depot
Salak Jaya
Taman Cheras
Salak Selatan
Taman Midah
Sri Permaisuri
Jalan Yaacob Latif

The MRT Circle Line, also known as MRT 3, is a proposed thirteenth rail transit line, the third Mass Rapid Transit line and the fifth fully automated and driverless rail system in the Klang Valley region of Malaysia. Once completed, this line would form the first loop line of the Klang Valley Integrated Transit System.

On 17 July 2025, the Minister of Transport approved the Final Railway Scheme for the project. Following a review of the feedback from the 2024 Public Inspection, the project adopted an "Intermediate MRT" (i-MRT) system technology with shorter 4-car trainsets and tighter turning radii to significantly reduce land acquisition. The line is currently in the land acquisition phase with construction expected to begin in 2027 and the line scheduled to be fully operational by 2032.

The circle line will be numbered 13 and coloured blue violet on official transit maps.