Klang Valley Integrated Transit System

Klang Valley Integrated Transit System
Rapid KL Express Rail Link KTM Komuter
Batu Caves-Pulau Sebang Line & Tanjung Malim-Port Klang Line
Kajang Line
Putrajaya Line
Ampang Line & Sri Petaling Line
KLIA Ekspres & KLIA Transit
KL Monorail Line
BRT Sunway Line
Kelana Jaya Line
Shah Alam Line
Overview
Native nameSistem Transit Bersepadu Lembah Klang (Malay)
LocaleKlang Valley and Greater Kuala Lumpur
Transit typeCommuter rail, rapid transit & bus rapid transit
Number of lines
13 (12 operational & 1 suspended)
Number of stations
216 transit stations
Daily ridership
1,031,537 (2025)
(only Rapid KL)
Annual ridership
356,397,644 (2025)
Websitehttps://myrapid.com.my/
Operation
Began operation
14 August 1995 (1995-08-14)
Operators
Technical
System length593.3 km (369 mi)
Track gauge1,000 mm (3 ft 3+3⁄8 in)

1,435 mm (4 ft 8+1⁄2 in)

Straddle beam monorail

Fully elevated single carriageway

Electrification25 kV 50 Hz AC overhead line

750 V DC third rail

The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the Klang Valley region and Greater Kuala Lumpur in Malaysia. The system commenced operations in August 1995 with the introduction of commuter rail service on the existing rail between Kuala Lumpur and Rawang. The system have since expanded and currently consists of 12 fully operating rail lines in a radial formation; two commuter rail lines, 7 rapid transit lines, 1 bus rapid transit line, 2 airport rail links to the Kuala Lumpur International Airport's (KLIA) Terminal 1 and Terminal 2, and one temporarily suspended airport rail link to the Sultan Abdul Aziz Shah Airport. The system encompasses 593.3 kilometres (368.7 mi) of grade-separated railway with 216 operational stations.