Line 20 (Beijing Subway)

Line 20
 20 
Overview
Other nameM20, R4 (planned name)
StatusUnder construction
Termini
  • Guanzhuang Lu Xikou
  • Yanjing Qiao
Stations5 (Phase 1)
Service
TypeRapid transit
SystemBeijing Subway
DepotZhuangtoucun
Rolling stock4-car Type A
History
Opened2030 (Phase 1)
Technical
Line length20.78 km
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in)

Line 20 of the Beijing Subway (Chinese: 北京地铁20号线; pinyin: běijīng dìtiě èrshí hàoxiàn), or Line R4 (Chinese: 北京地铁R4线; pinyin: běijīng dìtiě R sì xiàn) is a rapid transit line under construction in Beijing.

The first phase of Line 20 will be 20.78 km in length with 5 stations. All stations except Linhe are underground stations. It runs from Guanzhuang Lu Xikou on Line 3 in Chaoyang District to Yanjing Qiao in Shunyi District.

It is expected to open in 2030. There will be through service between Line 3 and Line 20.