Line 3 (Beijing Subway)

Line 3
A SFM86 type train leaving Dongsi Shitiao station of Line 3
Overview
Other nameM3 (planned name)
StatusOperational
Termini
Stations10 (Phase I)
Colour on map     Red
Service
TypeRapid transit
SystemBeijing Subway
Rolling stockType A, 4-car / 8-car
History
OpenedDecember 15, 2024 (2024-12-15)
Technical
Line length14.7 km (9.1 mi) (Phase I)
CharacterFully underground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1,500 V DC overhead catenary
Operating speed80 km/h (50 mph)
Route map

planned extension to Tiancun
Dongsi Shitiao
Left arrow inner – outer Right arrow
Workers' Stadium
Tuanjiehu
Left arrow inner – outer Right arrow
Chaoyang Park
connection canal between Shuidui Lake and Honglingjin Lake
Shifoying
Chaoyang railway station
Yaojiayuan
Dongbanan
Dongba
Ba river
Dongbabei
Dongba depot
Beixiao river
Guanzhuang Lu Xikou
Louzizhuangqiaoxi
Louzizhuang
Gaoxinzhuang
Caogezhuangbei

Line 3 of the Beijing Subway (Chinese: 北京地铁3号线; pinyin: běijīng dìtiě sān hàoxiàn) is a rapid transit line in Beijing, China. It opened on December 15, 2024. It is colored rose red on system maps.