Line 1 (Guangzhou Metro)

Line 1
A Line 1 train in 2023
Overview
Other name(s)M1 ("十" shape plan name)
Zhongshanlu line
(中山路线)
StatusOperational
OwnerCity of Guangzhou
LocaleTianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
Termini
Stations16
Color on map     Yellow (#f3d03e)
Service
TypeRapid transit
System Guangzhou Metro
Services1
OperatorGuangzhou Metro Corporation
DepotXilang Depot
Rolling stock21 cars Siemens Modular Metro-AEG/Adtranz (original order)
48 Bombardier Movia with CRRC Changchun Railway Vehicles
Daily ridership788,700 (2025 daily average)
2 million (2015 Peak)
History
Opened28 June 1997 (1997-06-28)
Last extension16 February 1999 (1999-02-16)
Technical
Line length18.5 km (11.50 mi)
Number of tracksDouble-track
CharacterUnderground and At-grade
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC (overhead lines)
Operating speed80 km/h (50 mph)
SignallingSiemens Trainguard LZB 700 M, FTGS Moving block
Route map

 11  Up arrow Outer Circle
 3  Right arrow to Airport North (Terminal 2)
Guangzhou East Railway Station
 3   11   18 
 11  Right arrow Inner Circle
 18  Right arrow to Wanqingsha
Tianhe Sports Center
 13  Right arrow to Xinsha
Tiyu Xilu
 3  (OSI to  10   13 )
 3  Right arrow to Haibang
 10  Right arrow to Xilang
 13  Left arrow to Chaoyang
Yangji
 5 
 5 
Left arrow to Jiaokou
to Wenchong Right arrow
Dongshankou
 6 
 6  Left arrow to Xiangxue
Martyrs' Park
 12 
Peasant Movement Institute
Connection to Line 2
Gongyuanqian
 2 
Ximenkou
Chen Clan Academy
 8 
Changshou Lu
Huangsha
 6 
 6  Left arrow to Xunfenggang
 22  UpperLeft arrow to Airport North (Terminal 2)
 11 
Left arrow Inner Circle
Outer Circle Right arrow
Fangcun
 11   22   28 
 28 
Left arrow to Luzhou
to Xintang Right arrow
Huadiwan
Huadi River
Kengkou
Xilang Depot
Xilang
 Guangfo   10   22 
Line 1
Simplified Chinese广州地铁1号线
Traditional Chinese廣州地鐵1號線
Cantonese YaleGwóngjāu Deihtit Yāt Houh Sin
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Yī Hào Xiàn
Yue: Cantonese
Yale RomanizationGwóngjāu Deihtit Yāt Houh Sin
Jyutpinggwong2 zau1 dei6 tit3 jat1 hou6 sin3
Canton Romanizationguong2 zeo1 déi6 tid3 yed1 hou6 xin3

Line 1 of the Guangzhou Metro runs from Xilang to Guangzhou East Railway Station (18.5 km (11.50 mi)). Apart from Kengkou and Xilang, all stations in Line 1 are underground. The first section, from Xilang to Huangsha, opened on 28 June 1997. The full line started operation on 28 June 1999. Line 1 is coloured yellow.