Line 12 (Guangzhou Metro)

Line 12
Line 12 train at Xunfenggang station
Overview
StatusIn operation
OwnerCity of Guangzhou
LocaleBaiyun, Yuexiu, Haizhu and Panyu districts
Guangzhou, Guangdong
Termini
Stations18 as of 13 February 2026; 7 under construction
Service
TypeRapid transit
SystemGuangzhou Metro Guangzhou Metro
Services2; East and West
OperatorGuangzhou Metro Corporation
Daily ridership169,900 (2025)
History
Opened29 June 2025 (2025-06-29)
Technical
Line length37.6 km (23.36 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Operating speed80 km/h (49.71 mph)
Route map

Xunfenggang Stabling Yard (Line 6)
Xunfenggang
 6 
Xunfenggang North
Chenxiangsha Island
Baisha River
Chatou Depot
Xizhou
 13 
 13  Right arrow to Chaoyang
Julong
 8 
Connection to Line 24/  22  Up arrow to Panyu Square
Guangzhou Baiyun Railway Station
 22   24  Foshan Metro  6 
Foshan Metro  6 
Left arrow to Baiyun Dongping
to Huanzhen Xilu Right arrow
Jingguang Railway /  22  Down arrow to Airport North (Terminal 2)
Tangchong
Xinshixu
 14 
Baiyun Culture Square
 2 
Guangzhou Gymnasium
Jingtai
Keziling
 11  Right arrow Inner Circle
Guangzhou University of
Chinese Medicine
 11 
 11  Left arrow Outer Circle
Luhu Lake
(OSI to  5  Taojin/  5 
Left arrow to Jiaokou
to Wenchong Right arrow
)
Jianshe 6th Road
 13 
 13  Right arrow to Xinsha
Martyrs' Park
 1 
 6  Up arrow to Xiangxue
Donghu
 6   10 
 10  Left arrow to Xilang
Ersha Island
 28  Left arrow to Luzhou
Chigang Pagoda
 28 
 28  Right arrow to Xintang
Chigang
 8 
Connection to Line 8
Chisha North
Chisha Depot (Line 11)
 11  Left arrow Inner Circle
Connection to Line 11
Chisha
 11 
 11  Right arrow Outer Circle
Guangfo circular IR
Beishan
 4  Right arrow to Huangcun
Guanzhou River
Guanzhou
 4 
Guanzhou River
Higher Education
Mega Center North
 4 
Reserve branch line extension
 7  Right arrow to Yanshan
Higher Education
Mega Center South
 4   7 
Higher Education Mega Center South
Stabling Yard
Future extension
Lijiao Stream
 7  Down arrow to Meidi Dadao

Line 12 of the Guangzhou Metro (Chinese: 广州地铁12号线) is a 27.9 km (17.34 mi) fully automated rapid transit line in Guangzhou, China. It currently operates as 2 separate services, with a western and eastern section. The 9-station western section between Xunfenggang and Guangzhou Gymnasium and the 9-station eastern section between Ersha Island and Higher Education Mega Center South except Chigang opened on 29 June 2025, while the middle section between Guangzhou Gymnasium and Ersha Island is still under construction. Chigang station opened on 13 February 2026.