Line 10 (Guangzhou Metro)

Line 10
Line 10 train at Xilang station
Overview
Other name(s)M10 (plan name)
Wushan line (五山线)
StatusIn operation
OwnerCity of Guangzhou
LocaleLiwan, Haizhu, Yuexiu and Tianhe districts
Guangzhou, Guangdong
Termini
Stations12 as of 29 December 2025; 1 under construction, 5 pending renovation
Service
TypeRapid transit
SystemGuangzhou Metro Guangzhou Metro
Services1
OperatorGuangzhou Metro Corporation
Daily ridership139,200 (2025 average)
History
Opened29 June 2025 (2025-06-29)
Technical
Line length17.2 km (10.7 mi) (initial section)
25.35 km (15.75 mi)
(including the Line 3 branch dismantling section)
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Operating speed80 km/h
Route map

 6  Up arrow to Xiangxue
Tianhe Coach Terminal
Bus interchange
 6 
 6  Left arrow to Xunfenggang
Wushan
South China Normal University
 11 
 11 
Left arrow Outer Circle
Inner Circle Right arrow
Gangding
Shipaiqiao
Up arrow  3  until renovation
Tiyu Xilu
 1   3 
 3 
Left arrow to Airport North (Terminal 2)
to Haibang Right arrow
 1  Left arrow to Xilang
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
Yangji East
Wuyangcun
 5 
 5  Left arrow to Jiaokou
 6  Left arrow to Xiangxue
Donghu
 6   12 
 6  Left arrow to Xunfenggang
Binjiang East Road
Haizhu Stream
Sun Yat-sen University South Gate
 11 
Left arrow Inner Circle
Outer Circle Right arrow
Wufeng
 11 
Dongxiao South
 2 
Gongye Avenue South
Daganwei
Yajisha Island
Dongsha
Foshan Metro  11 
Left arrow to Hedong East
to Xijiao Right arrow
Huawei
Foshan Metro  11 
Guanggang New Town Depot
Future Extension
Xilang
 1   Guangfo   22 
 22  Down arrow to Fangcun
Line 10
Simplified Chinese广州地铁10号线
Traditional Chinese廣州地鐵10號線
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Shí Hào Xiàn
Bopomofoㄍㄨㄤˇ ㄓㄡ ㄉㄧˋ ㄊㄧㄝˇ ㄕˊ ㄏㄠˋ ㄒㄧㄢˋ
Yue: Cantonese
Jyutpinggwong2 zau1 dei6 tit3 sap6 hou6 sin3
Line 10 drawn to scale.

Line 10 of the Guangzhou Metro is a 17.2 km (10.7 mi) rapid transit rail line in operation in Guangzhou. It runs from Tianhe district in the northeast to Liwan district in the southwest, forming an X shape together with Line 12. The line opened on 29 June 2025.