Krishnarajapura metro station

Krishnarajapura
Front Entrance of this metro station under Namma Metro's Purple Line and upcoming Blue Line as of April 2026
General information
Other namesKR Pura
LocationNH 44, Chinappa Colony, Mahadevapura, Bengaluru, Karnataka 560016
Coordinates13°00′00″N 77°40′41″E / 12.99999°N 77.67794°E / 12.99999; 77.67794
System
Namma Metro station
OwnerBangalore Metro Rail Corporation Ltd (BMRCL)
OperatorNamma Metro
LinePurple Line Blue Line
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Challaghatta
Side platform (TBC)
Platform-3 → Central Silk Board
Platform-4 → KIAL Terminals
Tracks2
Connections Krishnarajapuram
Construction
Structure type
Elevated, Double track
Platform levels
2 (Operational under Purple Line)
2 (Under Construction under Blue Line)
ParkingCar parking Two & Four Wheelers
AccessibleYes Disabled access
Architect  ITD - ITD Cementation India JV
  Shankaranarayana Constructions (SNC)
Other information
StatusStaffed
Station codeKRAM
History
Opened  26 March 2023 (2023-03-26)
Opening  December 2026 (December 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Singayyanapalya Purple Line Benniganahalli
towards Challaghatta
Sarasvathi Nagara Blue Line
(Future service)
Kasturinagara
Location

Krishnarajapura (abbreviated as K.R. Pura) is an important elevated metro station on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru, India. This will be an upcoming interchange metro station after Nadaprabhu Kempegowda Stn., Majestic having interchange with Purple and Green Lines. Around this station, holds the main KR Puram Railway station followed by some locations like KR Pura Hanging Bridge leading towards Hoskote, Tin Factory, ITI General Hospital and many more. This station under Blue Line is planned to be operational December 2026 instead of June 2026.

The Whitefield - Krishnarajapura trial runs were successfully conducted (under Purple Line) from 25 October for a month. This metro station (under Purple Line) was inaugurated on March 25, 2023 by Prime Minister Narendra Modi and was commenced to the public on March 26, 2023.