Pink Line (Namma Metro)

Pink Line
Overview
Other names
  • Second North–South Corridor
  • Line 4
  • Nagawara–Kalena Agrahara Line
Native name
  • Yeḷegeṁpu mārga
  • Nasugeṁpu mārga
StatusElevated Section - Ready for Inauguration
Underground Section - Under Construction
OwnerBangalore Metro Rail Corporation Limited (BMRCL)
LocaleBangalore, Karnataka, India
Termini
Connecting linesOperational (2):
Purple Line Yellow Line
Upcoming (3):
Blue Line Red Line Orange Line
Planned (1):
Inner Ring Line
Stations18
Websitebmrc.co.in
Service
TypeMetro
SystemNamma Metro
DepotKothanur
History
Planned openingPhase 1 - 14th September 2026 (14th September 2026)
Phase 2 - January 2027 (January 2027) (TBC)
Technical
Line length21.25 km (13.20 mi)
Number of tracks2
CharacterElevated, At Grade and Underground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
SignallingCBTC Signalling System
Pink Line Map (TBC)

Nagawara
Blue Line
Under construction
Kadugundanahalli
Indian Railways towards
UpperLeft arrow Yesvantpur Jn and Banaswadi LowerRight arrow
Venkateshpura
Tannery Road
Pottery Town Bangalore East railway station
Indian Railways towards
Left arrow KSR Bengaluru and Krishnarajapuram Right arrow
Cantonment Railway Station Bengaluru Cantonment railway station
Shivaji Nagar
Mahatma Gandhi Road
National Military School
Langford Town
Lakkasandra
Dairy Circle
Phase 2 (Mar 2027) Up arrow
Phase 1 (Sept 2026) Down arrow
(TBC)
Tavarekere
Jayadeva Hospital
JP Nagar 4th Phase
Orange Line
Approved
IIMB
Hulimavu
Mainline rail interchange Kothanur Depot
Kalena Agrahara

The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bengaluru, Karnataka, India. The 21.25 km (13.20 mi) line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north.

The line passes from the southern suburbs and neighbourhoods of Bengaluru, such as Gottigere, Hulimavu, Jaya Prakash Nagar, Tavarekere, Dairy Circle Junction, Langford Town along Bannerghatta Road with the central parts of Bengaluru such as MG Road, Shivaji Nagar, Cantonment and passes through the northern residential areas of Bangalore such as along Pottery Town, Venkateshpura, Kadugondanahalli and Nagawara along the Nagawara Road.

The Pink Line is mostly underground (13.92 km (8.65 mi)) but also has a 6.98 km (4.34 mi) elevated section and a 0.48 km (0.30 mi) at-grade (surface) section. There are 18 stations on the line, including 12 underground and 6 elevated ones. Pink Line will have an interchange with the Purple Line at MG Road station. It will also have interchanges with the Yellow line at Jayadeva Hospital station, the Blue Line at Nagawara, and the Orange Line at JP Nagar 4th Phase. The Blue Line is under construction.

The entire line is planned to open in two phases where the first phase, covering a total distance of 7.5 km stretch (Kalena Agrahara - Tavarekere), is expected to be operational by September 2026 whereas the second phase, covering the remaining distance of 13.8 km stretch (Dairy Circle - Nagawara) is expected to be operational around March 2027 (along with Phase 2A of Blue Line).

This line was initially planned as Red Line, when the Phase 2 plan was released in 2014. However, the colour was changed from Red to Pink in late 2019, stating that the colour Red meant "stop" in transport/travel (eg: Red signal, Red flag etc.). However, the colour Red got transferred to another upcoming metro line, belonging to BMRCL Phase-3A