IIMB metro station

I.I.M.B
This metro station's final stages before Operations under Namma Metro's Pink Line as of April 2026
General information
LocationNear Fortis Hospital, Bannerghatta Road, Bilekahalli, Bengaluru, Karnataka 560076
Coordinates12°53′44″N 77°35′59″E / 12.8956378°N 77.5996666°E / 12.8956378; 77.5996666
System
Namma Metro station
OwnerBengaluru Metro Rail Corporation Ltd (BMRCL)
OperatorNamma Metro
LinePink Line
PlatformsSide platform
Platform-1 → Kalena Agrahara
Platform-2 → Tavarekere *
* (Further extension to Nagawara in the future)
Tracks2
Construction
Structure type
Elevated, Double track
Platform levels
2 (TBC)
Parking(TBC)
Accessible(TBC)
ArchitectGR Infraprojects Ltd. (Simplex contract terminated in 2021)
Other information
StatusFinal Stages before Operations (95%)
Station code(TBC)
History
OpeningSeptember 2026 (September 2026) (TBC)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
JP Nagar 4th Phase
towards Tavarekere
Pink Line
(Operational from September 2026)
Hulimavu
JP Nagar 4th Phase
towards Nagawara
Pink Line
(Operational around March 2027)
Location

IIMB metro station is an upcoming elevated metro station on the North-South corridor of the Pink Line of Namma Metro in Bengaluru, India. This metro station serves mainly the Indian Institute of Management Bangalore and adjoining areas.

As per the latest updates, this metro station, under the first phase, covering a total distance of 7.5 km elevated stretch (Kalena Agrahara - Tavarekere), is expected to be operational around September 2026 instead of December 2025.