Kavi Subhash metro station

Kavi Subhash
Kavi Subhash metro Station new complex
General information
LocationPanchasayar Main Rd, Tentulberia
Rajpur Sonarpur, South 24 Parganas
West Bengal, 700094
India
Coordinates22°28′20″N 88°23′54″E / 22.47234°N 88.39828°E / 22.47234; 88.39828
SystemKolkata Metro
OperatorMetro Railway, Kolkata
Lines
Platforms4 (2 side platforms and 1 Spanish solution)
Tracks4
Connections
Construction
Structure type
At-Grade
ParkingYes
AccessibleYes Disabled access
Other information
Station code
History
Opened
Closed  Blue Line : 28 July 2025 (2025-07-28)
Former namesNew Garia
Services
Preceding station The logo of the Kolkata Metro. Kolkata Metro Following station
Terminus Orange Line Satyajit Ray
towards Beleghata
Shahid Khudiram
towards Dakshineswar
Blue Line
(Closed indefinitely)
Terminus
Location

Kavi Subhash (formerly known as New Garia) is the at-grade southern terminus and interchange metro station of the north–south corridor (Blue Line) and Bypass Corridor (Orange Line) of Kolkata Metro in New Garia, Kolkata, West Bengal, India. It is named after poet Subhash Mukhopadhyay. This station was opened to the public on the day of Mahalaya in 2010.

This metro station is at ground level and located adjacent to New Garia railway station on the Sealdah - Sonarpur section.

After a lot of hardships and developmental work, the Kavi Subhash–Hemanta Mukhopadhyay section of Orange Line was inaugurated on 6 March 2024.

On 28 July 2025, cracks were detected in the last four columns of the Line-1's Up platform. The north–south platforms of the station was closed to passengers as a safety measure and the Blue Line trains were terminated at Shahid Khudiram metro station. However, the empty rakes continued to run up to the station for reversal and maintenance at its depot. On investigation, it was found that the columns supporting the platforms were weakened beyond repair. Metro authorities decided to raze the entire north–south complex of the station (keeping the tracks intact) and rebuild it. E-tenders were floated, and the work was estimated to take up to ten months to complete.