Pink Line (Kolkata Metro)

Pink Line
Kolkata Metro Pink line pillars, under construction
Overview
StatusPlanned but construction not started
OwnerIndian Railways
LocaleIndia Kolkata Metropolitan Region, India
Termini
Connecting linesBlue Line
Stations11
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
OperatorMetro Railway, Kolkata
DepotNoapara Depot
Technical
Line length12.50 kilometres (7.77 mi)
Number of tracks2
CharacterElevated
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC using third rail
Operating speed80 km/h (designed)
Route Map

Pink Line is a planned rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. The line will run from Baranagar to Barrackpore,(with a proposed extension to Kalyani to cater AIIMS Kalyani and IISER Kolkata) with a length of 12.50 km (7.77 mi). It was sanctioned in 2009, at a cost of Rs.2070 crore, to enable a quicker commuter service from the northern suburbs to Kolkata.

After proposal in 2009, there were problems related to construction due to the presence of arterial water pipelines, that supply water from Tala tank to Palta, below Barrackpore Trunk Road (or BT Road). Later, objections came from Kolkata Municipal Corporation (KMC) under Trinamool Congress rule, causing a postponement of this route. In 2026, after the Bharatiya Janata Party came to power in West Bengal, talks were resumed, followed by a No-Objection Certificate from KMC for realignment of pipelines under BT Road.