Golden Line (Delhi Metro)

Golden Line
Overview
Other nameLine 10, Line 11
StatusUnder construction
OwnerDelhi Metro
LocaleDelhi
Termini
StationsLine 10 (Main Line): 19
Elevated: 7
Underground: 12
Line 11 (Branch): 8
Elevated: 8
Service
TypeRapid transit
SystemDelhi Metro
OperatorDelhi Metro Rail Corporation
History
Planned openingLine 10 (Main Line): December 2026 (2026-12),
Line 11 (Branch): Approved
Technical
Line length38.17 km (23.72 mi)
Line 10 (Main Line): 29.785 km (18.508 mi),
Line 11 (Branch): 8.385 km (5.210 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC from overhead catenary
Route map

Branch Line
Terminal 1 IGI Airport
Delhi Aerocity
Delhi–Gurgaon Expressway
Lajpat Nagar
Mahipal Pur
Vasant Kunj
Andrews Ganj
Kishangarh
Greater Kailash-1
Chhatarpur
NH148A-IN.svg NH 148A (Mehrauli-Gurgaon Highway)
Chirag Delhi
Chhatarpur Mandir
Pushpa Bhawan
IGNOU
Saket District Centre
Neb Sarai
Pushp Vihar
Saket G Block
Ambedkar Nagar
Khanpur–Vayusenabad
Sangam Vihar–Tigri
Anandmayee Marg Jn.
Tughlakabad Railway Colony
Indian Railways
Tughlakabad Station
Sarita Vihar Depot
Sarita Vihar Depot
Madanpur Khadar
Kalindi Kunj

The Golden Line (Line 10 and Line 11) is a rapid transit line of the Delhi Metro currently under construction in South Delhi. It will commence from Delhi Aerocity and terminate at Tughlakabad. Further extensions to Kalindi Kunj and Terminal 1-IGI Airport have also been approved as part of Phase 5A extension, and the works are currently underway. The main line (Line 10) will be 29.785 km (18.508 mi) long with 19 stations, comprising 7 elevated and 12 underground stations. The branch line (Line 11) will be 8.385 km (5.210 mi) long with eight stations, all of which will be elevated.

It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic congestion and pollution prevalent on the streets of Delhi. Construction of the line began in June 2022 as part of the fourth phase of the Delhi Metro's development, and partial operations are expected to start by the end of 2026.