Line 7 (Shenzhen Metro)

Line 7
Overview
Native name七号线; 七號線; cat1 hou6 sin3; Qī hào xiàn
StatusOperational
LocaleShenzhen, China
Termini
Stations29
Color on map     Blue (#0035ad)
Service
TypeRapid transit
SystemShenzhen Metro
OperatorSZMC (Shenzhen Metro Group)
Depot(s)Shenyun depot
Antuo Hill stabling yard
Rolling stockCRRC Changchun (701-741/742)(6A/3A+3A)
Daily ridership723,000 (Highest single day recorded on 31 December 2024)
History
Opened28 October 2016 (2016-10-28)
Technical
Line length32.84 km (20.41 mi)
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC (overhead line)
Operating speed80 km/h (50 mph)
SignallingCBTC Moving block
Route map

27 to Gangtou West Up arrow
SZU Lihu Campus
Peking University
Xili Lake
Xili
connection to Line 5
27 Left arrow to Songpingcun
Chaguang
Zhuguang
Longjing
Taoyuancun
Shenyun
Antuo Hill Stabling Yard
Shenyun Depot
connection to Line 2
Antuo Hill
Nonglin
9 to Wenjin Right arrow
Chegongmiao
Shangsha
22 to Liguang Right arrow
Shawei
Shixia
Huanggangcun
Fumin
Huanggang Checkpoint
Fulin
Chiwei
Huaqiang South
Huaqiang North
Huaxin
Huangmugang
Bagualing
Hongling North
Sungang
17
Left arrow to Luohu West
to Shanglilang Right arrow
Honghu
Tianbei
Tai'an

Line 7 of the Shenzhen Metro has a length of 32.84 km (20.41 mi) and a total of 29 stations. It connects SZU Lihu Campus to Tai'an, travelling East–West across Shenzhen in a "V" shape. Construction started on 23 October 2012, with track laying complete in April 2016. The line started service on 28 October 2016.