Line 10 (Shenzhen Metro)

Line 10
Overview
StatusIn operation
LocaleShenzhen, China
Termini
Stations24
Color on map     Pink (#F8779E)
Service
TypeRapid transit
SystemShenzhen Metro
OperatorSZMC (Shenzhen Metro Group)
Depot(s)Liangmao Hill Depot
Yitian stabling yard
Rolling stockCRRC Changchun (1001-1035) (Type A, 8 cars)
History
Opened18 August 2020 (2020-08-18)
Technical
Line length29.3 km (18.2 mi)
Number of tracksDouble-track
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC (overhead lines)
Operating speed80 km/h (50 mph)
SignallingCBTC
Route map

Huanggekeng
Dynamic Town
Guanjingtou
Youganpu
Longping Road
Shuangyong Street
Pinghu
Pinghu railway station
Hehua
Huanancheng
Mugu
Shanglilang
17 to Luohu West Right arrow
Liangmao Hill
Liangmao Hill Depot
Gankeng
Xuexiang
Gangtou
Huawei
Bei'er Road
25
Left arrow to Shilong
to Jihua Hospital Right arrow
Bantian North
Wuhe
Guangyayuan
Nankeng
Yabao
6
UpperLeft arrow to Songgang
 
connection to Line 9
Maling
Donggualing
connection to Line 3
Lianhuacun
Gangxia North
Gangxia
4 Up arrow to Niuhu
Fumin
Futian Checkpoint
4(OSI)
Yitian Stabling yard

Line 10 (simplified Chinese: 十号线; traditional Chinese: 十號線; Jyutping: sap6 hou6 sin3; pinyin: Shíhào Xiàn), also known as the Pinghu line or Bantian line (坂田线; 坂田線; baan2 tin4 sin3; Bǎntián Xiàn) of the Shenzhen Metro began construction at the end of 2015. The line opened on 18 August 2020. Line 10 has a length of 29.3 km (18.2 mi) and a total of 24 stations. It connects the Futian Checkpoint to Shuangyong Street. In the southern terminus of the line, a 555-meter-long and 50.5-meter-wide double deck underground depot capable of storing 16 trains will be constructed.