Andheri West metro station
Andheri (West) | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
Andheri (West) metro station as seen from New Link Rd | |||||||||||
| General information | |||||||||||
| Location | Sahakar Nagar, Azad Nagar, Andheri West, Mumbai, Maharashtra 400053 | ||||||||||
| Coordinates | 19°07′45″N 72°49′53″E / 19.1291337°N 72.8314307°E | ||||||||||
| Owner | |||||||||||
| Operator | |||||||||||
| Line | 2A-Yellow Line | ||||||||||
| Platforms | 2 side platforms | ||||||||||
| Connections | |||||||||||
| Construction | |||||||||||
Structure type | Elevated | ||||||||||
| Parking | No | ||||||||||
| Other information | |||||||||||
| Station code | 217 | ||||||||||
| History | |||||||||||
| Opened | 19 January 2023 | ||||||||||
| Passengers | |||||||||||
| 2023 | 18,500 daily | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Andheri (West) is the elevated southern terminal station on the north–south corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This station is located in Andheri, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 19 January 2023.