Sydney Metro Western Sydney Airport

Sydney Metro Western Sydney Airport
View of the tracks in January 2026
Overview
StatusUnder construction
OwnerTransport for NSW
LocaleSydney, New South Wales, Australia
Stations6
Service
TypeRapid transit
SystemSydney Metro
OperatorRATP Dev
Rolling stockSiemens Inspiro
History
Planned openingDecember 2027 (planned)
Technical
Line length23 km (14 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC from overhead catenary
Route map


Schofields
proposed extension
St Marys
Orchard Hills
Luddenham
Airport Business Park
Airport Terminal Western Sydney Airport
Bradfield
proposed extension
Macarthur
Disabled access
All Metro stations will
have wheelchair access

Sydney Metro Western Sydney Airport, previously known as Sydney Metro Greater West, is a rapid transit rail project currently under-construction in Greater Western Sydney. The project involves the construction of a 23-kilometre (14 mi) line as part of the Sydney Metro system. The line will operate between St Marys, where the line will connect to the Main Western railway line, and Bradfield via the Western Sydney Airport. It is intended to provide public transport for the upcoming Western Sydney Airport.

Construction of the line started in December 2022 and was initially expected to be completed in late 2026 in time for the opening of the airport. However, this was later pushed back to December 2027, while reports suggest this risks being delayed further to 2028.