Sydney Metro

Sydney Metro
An Alstom Metropolis approaching Kellyville station
A Metropolis Stock at Chatswood
Overview
OwnerNSW Government (via the Transport Asset Manager of New South Wales)
LocaleSydney
Transit typeRapid transit
Number of lines
  • 1
  • 2 (under construction)
  • 3 (total)
Line numberM1, M2, M3
Number of stations
  • 21
  • 15 (under construction)
  • 10 (under conversion)
  • 46 (total)
Daily ridership
245,574 (Weekdays FY2025/26)
Annual ridership
72,475,869 (FY2025/26)
Chief executive
Hugh Lawson (acting)
Websitesydneymetro.info
Operation
Began operation
26 May 2019 (2019-05-26) (Tallawong to Chatswood)
19 August 2024 (2024-08-19) (Chatswood to Sydenham)
OperatorMetro Trains Sydney
CharacterElevated, open cut and underground
Number of vehicles
North West and City & South West: 45 6-car Metropolis Stock sets (270 cars)
Western Sydney Airport: 12 3-car Inspiro Stock sets (36 cars)
Train length
  • Sydney Metro North West, City and South West: 6 Carriages (with potential for 2 additional carriages to be added)
  • Sydney Metro Western Sydney Airport: 3 or 4 carriages
Headway4 minutes (peak frequency)
5–7 minutes (intra-peak frequency)
10 minutes (off-peak & weekend frequency)
Technical
System length
  • 52 km (32 mi)
    14 km (8.7 mi) (under construction)
  • 47 km (29 mi) (planned)
  • 113 km (70 mi) (total)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead catenary:
Top speed100 km/h (62.1 mph)
System map

() Bankstown
Punchbowl
Tallawong
Wiley Park
Rouse Hill
Lakemba
Kellyville
Belmore
Bella Vista
Campsie
Norwest
Canterbury
Hills Showground
Hurlstone Park
Castle Hill
() Dulwich Hill
Cherrybrook
Marrickville
Epping ()
() Sydenham
Macquarie University
Waterloo
Macquarie Park
Central
North Ryde
Gadigal
Chatswood ()
() Martin Place
Crows Nest
Barangaroo
Victoria Cross



Stage 2
(City & Southwest)
Stage 1
(North West)
Disabled access All Metro stations have wheelchair access

The Sydney Metro is an automated rapid transit system in Sydney, New South Wales, Australia. It currently consists of one route, the Metro North West & Bankstown Line, running between Tallawong and Sydenham and consisting of 21 stations on 52 km (32 mi) of twin tracks, mostly underground.

The first line of the network, between Tallawong and Chatswood, was initially opened in May 2019 and has since been extended from Chatswood to Sydenham as of August 2024, as part of the first stage of the City & Southwest project. The second stage of the project will then further extend this line to Bankstown as part of a partial conversion of the existing Bankstown railway line with a scheduled completion in mid-to-late 2026.

Two additional lines are also under construction, as part of the Sydney Metro West and Western Sydney Airport projects. The Western Sydney Airport project will construct a line approximately 23 km (14 mi) from St Marys to the new Bradfield Station in Badgerys Creek. It will comprise six stations and service the Western Sydney International (Nancy-Bird Walton) Airport, which is also currently under construction, upon its delayed opening in 2027.

Sydney Metro West will construct a 24 km (15 mi) new line from Westmead to a new station at Hunter Street in the Sydney CBD. It will comprise nine stations, serviced by fully underground twin tracks. The line will service Parramatta and Sydney Olympic Park upon opening in 2032.

When all current projects are complete, the network will amount to a total of 46 stations and 113 km (70 mi) of track.

The Metro North West & Bankstown Line of the Sydney Metro is Australia's only fully automated passenger rail system. It is managed by the Sydney Metro agency, under the umbrella of Transport for NSW. Services are operated by Metro Trains Sydney and integrated with the established Sydney Trains network. Its 52 km (32 mi) line also makes it the third-longest single driverless rapid transit line in the world, behind Rapid KL Putrajaya line and the Dubai Metro Red Line.