Metro North West & Bankstown Line

Metro North West & Bankstown Line
A Metropolis Stock train departing Kellyville, June 2019
Overview
Service typeRapid transit
LocaleSydney, Australia
First service26 May 2019 (2019-05-26) (Tallawong to Chatswood)
19 August 2024 (2024-08-19) (Chatswood to Sydenham)
18 October 2026 (2026-10-18) (projected) (Sydenham to Bankstown)
Current operatorMetro Trains Sydney
Route
TerminiTallawong
Sydenham
Stops21
Distance travelled51.5 km (32.0 mi)
Average journey time58 minutes
Service frequency3.5 minutes (weekday peak, until 7 June 2026)
5–7 minutes (weekday intra-peak)
7 minutes (weekends, until 7 June 2026)
10 minutes (weekday off-peak)
Technical
Rolling stockMetropolis Stock fully automated trains, 6 carriages per train
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification1,500 V DC from overhead catenary
Operating speedLimit of 100 km/h (62 mph)
Track ownerTransport Asset Manager of New South Wales

The M1 Metro North West & Bankstown Line is a rapid transit rail line in Sydney, New South Wales, Australia. The first and currently only line on the Sydney Metro network, it commenced operation on 26 May 2019, originally running between Tallawong and Chatswood, before the line was extended on 19 August 2024 to Sydenham. On 9 June 2026, leaked Transport for NSW documents revealed that the line to Bankstown is targeted to open on 18 October, however, this date is subject to change due to approval times.