Toa Payoh MRT station

Toa Payoh
 NS19 
大巴窑
தோ பாயோ
The rectangular-shaped station entrance with a connecting linkway (with a blue canopy) from the right
Exit D of Toa Payoh MRT station
General information
Location510 Lorong 6 Toa Payoh, Singapore 319398
Coordinates01°19′58″N 103°50′51″E / 1.33278°N 103.84750°E / 1.33278; 103.84750
SystemMass Rapid Transit (MRT) station
OwnerLand Transport Authority
OperatorSMRT Trains
Line
Platforms2 (1 island platform)
Tracks2
Connections Toa Payoh, Taxi
Construction
Structure type
Underground
Platform levels
1
AccessibleYes
Other information
Station codeTAP
History
Opened7 November 1987 (1987-11-07)
Passengers
June 202432,943 per day
Services
Preceding station Mass Rapid Transit Following station
Braddell
towards Jurong East
North–South Line Novena
Location
Toa Payoh is located in Singapore Rail central area
Toa Payoh
Toa Payoh
Location within Singapore Rail central area

Toa Payoh MRT station is an underground Mass Rapid Transit (MRT) station on the North–South Line (NSL) in Toa Payoh, Singapore. Located in the town centre of Toa Payoh, it is integrated with the Toa Payoh Bus Interchange and the HDB Hub, headquarters of the Housing and Development Board. The station is underneath the intersection of three roads: Lorong 1 Toa Payoh, Lorong 2 Toa Payoh and Lorong 6 Toa Payoh.

First announced in May 1982, construction of the station began in 1983 as part of Phase I of the MRT system. In August 1985, it became the first Mass Rapid Transit station in Singapore to have its concrete structure completed. It opened on 7 November 1987 and was one of the first MRT stations to operate in revenue service. It has a bright yellow scheme with a set of coloured tiles at the concourse level.