Thameslink (train operating company, 1997–2006)

Thameslink
Overview
FranchisesThameslink
2 March 1997 – 31 March 2006 (1997-03-02 – 2006-03-31)
Main stationsBedford, King's Cross,
Brighton
Other stationsLuton Airport, Blackfriars,
London Bridge, Gatwick Airport,
Wimbledon
Fleet74 Class 319
Stations called at56 (26 operated)
Parent companyGovia (Go-Ahead/Keolis)
Reporting markTR
PredecessorNetwork SouthEast
SuccessorFirst Capital Connect
Technical
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail (South of Farringdon)
25 kV 50 Hz AC Overhead (North of City Thameslink)

Thameslink was a British train operating company owned by Govia that operated the Thameslink franchise between March 1997 and March 2006.

The franchise was originally due to end on 31 March 2004, however a two-year extension was awarded to Govia by the Strategic Rail Authority on 13 February 2004. In December 2005, the Department for Transport awarded the new franchise to FirstGroup; thus the services operated by Thameslink were transferred to First Capital Connect on 1 April 2006.