First Capital Connect

First Capital Connect
Overview
FranchisesThameslink and Great Northern
1 Apr 2006 – 13 Sep 2014
Main regionsEast of England, London, South East England
Stations operated77
Parent companyFirstGroup
Reporting markFC
PredecessorsThameslink, 2 Mar 1997 – 31 Mar 2006
West Anglia Great Northern
SuccessorGovia Thameslink Railway, 14 Sep 2014 – 31 May 2026
Technical
Length778.9 km (484.0 mi)
Other
Websiteweb.archive.org/web/20150524160943/http://www.firstcapitalconnect.co.uk
Route map
Route map

First Capital Connect (FCC) was a British train operating company, owned by FirstGroup, that operated the Thameslink and Great Northern sectors from April 2006 to September 2014 which later became the Thameslink, Southern and Great Northern (TSGN) franchise.

First Capital Connect was a major provider of commuter and regional services in London and the south east of England. It operated passenger rail services from Luton and Bedford via the Thameslink to Sutton, Wimbledon and Brighton via Central London.

It also operated commuter, suburban and regional services out of London King's Cross and London Moorgate to Hertfordshire, Cambridgeshire and Norfolk. Major destinations served included Cambridge, King's Lynn and Peterborough.

First Capital Connect ceased operations at 02:00 on 14 September 2014, when the franchise was taken over by Govia Thameslink Railway, and became part of the larger Thameslink, Southern and Great Northern franchise.