Collins settlement site
| Collins settlement site | |
|---|---|
| 1803 Collins settlement site | |
Entrance to the lookout and graves, 2013 | |
A map of Port Phillip, marking Sullivan Bay, the settlement site, relative to Melbourne, Geelong, and Western Port | |
Location of the settlement site in Greater Metropolitan Melbourne | |
Interactive map of Collins settlement site | |
| 38°20′59″S 144°45′43″E / 38.349675°S 144.761860°E | |
| Type |
|
| Etymology | Colonel David Collins, RN |
| Associated with | Bunerong Bulak people |
| Location | Point Nepean Road, Sorrento, Mornington Peninsula, Melbourne, Victoria, Australia |
| History | |
| Founded | 16 October 1803 |
| Founder | Lt.-Gov. David Collins, RN |
| Abandoned | 20 May 1804 |
Settlement period | 217 days |
| Site notes | |
| Material |
|
| Area |
|
| Website | nepeanhistoricalsociety.asn.au |
Official name | Collins Settlement Site |
| Type |
|
| Designated | 17 November 1994 |
| Reference no. | H1050 |
| HO255 | |
Categories |
|
The Collins settlement site, also known as the 1803 Collins settlement site, is a colonial settlement and archaeological site, located on Point Nepean Road, one kilometre (0.6 mi) east of Sorrento, on the Mornington Peninsula, approximately 60 kilometres (37 mi) due south of Melbourne, in its south eastern suburbs, in Victoria, Australia.
Located on the traditional land of the Bunerong Bulak people, the Sullivan Bay site of initially 100 hectares (247 acres) was the first permanent colonial settlement in the area – that pre-dates the settlement of Melbourne – and lasted for a mere 217 days before the site was abandoned.
The settlement site was added to the Victorian Heritage Register on 17 November 1994 in recognition of its historic, archaeological, aesthetic (landscape), and social significance; and was also added to a non-statutory list by the Victorian branch of the National Trust on 30 June 1991, and was submitted for consideration to be added to the Australian National Heritage List on an unknown date, however, subsequently not considered due to timing considerations.