Shah Alam line

LRT Shah Alam Line
A 3-car CRRC Zhuzhou trainset near UiTM Shah Alam bound for Johan Setia
Overview
Other nameLRT3, SAL
Native nameLRT Laluan Shah Alam
StatusOperational
OwnerPrasarana Malaysia
Line number11 (sky blue)
LocaleKlang Valley
Termini
Stations25 (20 operational, 5 under construction)
Websitemyrapid.com.my
Service
TypeLight rapid transit
SystemRapid KL (brand) Rapid KL
Klang Valley Integrated Transit System
OperatorRapid Rail
DepotJohan Setia Depot
Rolling stockCRRC Zhuzhou LRV
22 three-car trainsets
Width: 2.7 m (8 ft 10 in) - narrow profile
Length: 57.60 m (189.0 ft)
Daily ridership56,788 (Q2 2026)
History
OpenedPhase 1:
29 June 2026 (2026-06-29)
Phase 2:
2031 (2031)
Technical
Line length37.8 km (23.5 mi)
Elevated: 35.3 km (21.9 mi)
Underground: 2.5 km (1.6 mi)
Number of tracks2
CharacterMostly elevated with a small underground section
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification750 V DC third rail
Conduction systemAutomated and driverless
Operating speed70 km/h (43 mph)
SignallingSiemens CBTC (Trainguard MT)
Route map

KG09
SA01
Bandar Utama Parking
SA02
Kayu Ara Parking
SA03
BU11
SA04
Tropicana
SA05
Damansara Idaman Parking
SA06
Subang
SA07
KJ27
Glenmarie 2
Parking
SA08
Temasya
SA09
Kerjaya
SA10
Stadium Shah Alam Parking
SA12
Dato' Menteri – SA Sentral (PKNS)
SA13
Raja Muda
SA14
UiTM Shah Alam
SA15
Seksyen 7 Shah Alam
SA16
Bukit Raja Selatan
SA17
Bandar Baru Klang
SA18
Pasar Klang Parking
SA19
Jalan Meru
SA20
Jambatan Kota
KD14
Klang Parking
800m Multiple fare trips2
SA21
Taman Selatan
SA22
Seri Andalas Parking
SA23
Klang Jaya
SA24
Bandar Bukit Tinggi Parking
SA25
Bandar Botanik
SA26
Johan Setia Parking
Johan Setia Depot

Interchange stations

integrated paid area
single fare trip
non-integrated paid area
multiple fare trips
interchange within same building
or cross-platform interchange

The LRT Shah Alam Line, previously known as the LRT Bandar Utama–Klang Line or simply LRT3, is a medium capacity rapid transit line which serves the western corridor of the Klang Valley in Selangor, Malaysia. It is the third LRT system, and the fourth fully automated and driverless rail line in the Klang Valley region. The line is operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia.

It was announced by Prasarana Malaysia in 2013 and work began in 2016. Construction was halted in 2018 for a review that followed the change of government and concerns over funding. The project was later revived after it was reclassified from a rapid transit line to a light metro. Its expected completion was moved from 2020 to 2024. Continued delays then pushed the projected completion date through 2025 and eventually into 2026.

The line forms part of the Klang Valley Integrated Transit System. It is numbered 11 and coloured sky blue on official transit maps. The line is one of four rapid transit lines in the Klang Valley that does not serve KL Sentral, the other three being the Ampang Line, Sri Petaling Line and the Putrajaya Line, as well as the first rapid transit line in the Klang Valley that is entirely outside the borders of the Federal Territory of Kuala Lumpur.