Seoul Subway Line 8

Line 8
Overview
Native name8호선(八號線)
Pal Hoseon
StatusOperational
Termini
Stations25
Color on mapPink
Service
TypeRapid transit
SystemSeoul Metropolitan Subway
OperatorSeoul Metro
DepotJamsil
Daily ridership312,005 (2024)
Ridership114.19 million (2024)
(Increase 7.2%)
History
Opened23 November 1996 (1996-11-23)
Last extension2024
Technical
Line length30.1 km (18.7 mi)
Number of tracks2
Electrification1,500 V DC overhead catenary
Route map

Amsa
810
Cheonho
811
Gangdong-gu Office
812
Mongchontoseong
813
Jamsil
814
Seokchon
815
Songpa
816
Garak Market
817
Munjeong
818
Jangji
819
Bokjeong
820
Sanseong
821
Sanseong
821
Namhansanseong
822
Dandaeogeori
823
Sinheung
824
Sujin
825
Moran
826
Maintenance Depot

Seoul Subway Line 8 of the Seoul Metropolitan Subway was built from 1990 to 1999 and mainly serves the southeastern parts of Seoul and Seongnam. The first section from Jamsil to Moran opened in 1996, and the second section from Moran to Amsa was opened in July 1999. The line color is rose. In 2019, Line 8 had an annual ridership of 112 million or about 307,000 people per day. At 17.7 km (11.0 mi) in length, Line 8 is the shortest of all heavy rail Seoul Metropolitan Subway lines.

Line 8 uses triangular, pink station signs; it shares its station sign design with Lines 5 and 7 (except in colour). The triangle's apex points in the direction that trains run, with the hypotenuse pointing in the opposite direction. The upper half of the triangle displays the station number, with the Hangul name of the station appearing in the middle and the English and Hanja names in the lower part. An arm projects from the apex to point to the next station, with another arm pointing from the back to the previous station.

In 2014, construction was planned to begin in order to extend the line north of the Han River through Guri station to Byeollae station on the Gyeongchun Line in Namyangju-si, Gyeonggi-do; construction began in October 2015. The extension added 11.37 km (7.06 mi) of line to the already existing 17.7 km (11.0 mi). with operation beginning on August 10, 2024.

Another northern extension is planned to bring the line to ByeollaeByeolgaram station on Seoul Subway Line 4.

The southern end is planned to be extended 3.9 km (2.4 mi) to Pangyo station.