Seoul Subway Line 5
| Line 5 | |||
|---|---|---|---|
4th Generation Line 5 train | |||
| Overview | |||
| Native name | 5호선(五號線) O Hoseon | ||
| Status | Operational | ||
| Termini | |||
| Stations | 57 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Seoul Metropolitan Subway | ||
| Operator | Seoul Metro | ||
| Daily ridership | 944,969 (2024) | ||
| Ridership | 345.86 million (2024) ( | ||
| History | |||
| Opened | 15 November 1995 | ||
| Last extension | 2021 | ||
| Technical | |||
| Line length | 58.9 km (36.6 mi) | ||
| Number of tracks | 2 | ||
| Electrification | 1,500 V DC overhead catenary | ||
| |||
Seoul Subway Line 5 of the Seoul Metropolitan Subway, dubbed the violet line, is a long line crossing from west to the east across the Seoul National Capital Area, South Korea. It is one of two subway lines in Seoul to cross under the Han River (the other being the Suin-Bundang Line), which is done at two points (between Mapo and Yeouinaru, and also between Gwangnaru and Cheonho). The main line runs through to Hanam Geomdansan Station while the branch line from Gangdong Station terminates at Macheon Station. In 2019, Line 5 carried an annual ridership of 334 million or about 915,000 passengers per day. It is the only line so far to have no above-ground stations, though it initially shared this distinction with Line 6 before the construction of Sinnae station.
Line 5 has a different station sign design compared to the first four lines; its station signs have purple or blue arrowhead-shaped designs with their station's number printed in the top, the Hangul name in the centre, and the English and Hanja names on the bottom, with an arm pointing out of the end of the arrowhead indicating the next station, with the straight part of the arrowhead holding the previous station's name. This design would be repeated in Lines 7 and 8, while a similar design with a chevron-shaped sign would be employed in Line 6.
The total length of this line is 58.9 kilometres (36.6 mi). Upon opening, it was among the longest underground railway tunnels of any kind constructed. Today it is the 8th longest continuous underground subway tunnel in the world, just behind Chengdu Metro Line 6, Qingdao Metro Line 1, Guangzhou Metro Line 18, Guangzhou Metro Line 3, Moscow Metro Bolshaya Koltsevaya Line, Beijing Subway Line 10 and Beijing Subway Line 6. Line 5 is also the first subway and passenger railway line in the Korean Peninsula to directly serve an airport, when the line was extended westward to Banghwa via Gimpo International Airport in 1996.