Metrolink (California)

Metrolink
A Metrolink train stopped at Chatsworth station
A Metrolink train stopped at Chatsworth station
Overview
LocaleSouthern California
Transit typeCommuter rail
Number of lines
  • 8
Number of stations
68
Daily ridership
20,700 (weekdays, Q2 2026)
Annual ridership
6,063,500 (2025)
Chief executive
Darren Kettle
HeadquartersWilshire Grand Center
Los Angeles, California
Websitemetrolinktrains.com
Operation
Began operation
October 26, 1992 (1992-10-26)
OperatorAlstom
Reporting marksSCAX
Infrastructure managers
Number of vehicles
60 locomotives, 274 rail cars, 3 DMU vehicles (Arrow), 1 ZEMU vehicle (Arrow)
Technical
System length545.6 mi (878.1 km)
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
Top speed90 mph (140 km/h)
System map
 Lancaster 
 Ventura–East 
Palmdale
Oxnard
Vincent Grade/Acton
Camarillo
Vista Canyon
Moorpark
Via Princessa
Simi Valley
Santa Clarita
Newhall
Chatsworth
Northridge
Sylmar/San Fernando
( 2031) Van Nuys
Pacoima
(planned)
Hollywood Burbank Airport Burbank Airport–South
Sun Valley
Burbank Airport–North Hollywood Burbank Airport via Airport bus
Downtown Burbank
Glendale
Central Maintenance Facility
L.A. General
Medical Center
(proposed)
 L.A. Union Station 
Cal State L.A.
(2028) Link US
El Monte
(limited)
Commerce
Baldwin Park
(proposed)
Pico Rivera
Covina
Norwalk/Santa Fe Springs
Fairplex
(fair days)
Buena Park
Pomona–North
Fullerton
Claremont
(planned)
Placentia
Montclair
Anaheim
Upland
Anaheim Canyon
Rancho Cucamonga
Ontario International Airport via Omnitrans (Brightline West 2029)
Orange
Fontana
(OC Streetcar 2027)
Santa Ana
Rialto
Tustin
Montebello/​Commerce
Irvine
Industry
Laguna Niguel/
Mission Viejo
Pomona–Downtown
San Juan Capistrano
Ontario–East
San Clemente
Jurupa Valley/Pedley
(
week-
ends
)
San Clemente Pier
Corona–West
 Oceanside 
Corona–North Main
Riverside–La Sierra
 Riverside–Downtown 
Riverside–
Hunter Park/UCR
Eastern Maintenance Facility
Moreno Valley/March Field
(planned)
Mead Valley
San Bernardino–Depot
Perris–Downtown
Arrow Maintenance Facility
 Perris–South 
 San Bernardino–Downtown  sbX
San Bernardino–Tippecanoe
Redlands–Esri
 Redlands–Downtown 
 Redlands–University 
Key
Antelope Valley Line enlarge…
enlarge… San Bernardino Line
Inland Empire–
Orange County Line
enlarge…
enlarge… Ventura County Line
Orange County Line enlarge…
enlarge… 91/Perris Valley Line
Riverside Line enlarge…
enlarge… Arrow
two lines
multiple lines
 Terminus 
 Partial terminus 
stations with
Amtrak service

Handicapped/disabled access All stations are accessible

Metrolink (reporting mark SCAX) is a commuter rail system in Southern California, serving Los Angeles, Orange, Riverside, San Bernardino, San Diego and Ventura counties. The system consists of eight lines and 68 stations operating on 545.6 miles (878.1 km) of track. This includes Arrow, which Metrolink operates under a contract with the San Bernardino County Transportation Authority (SBCTA).

In 2025, the system had a ridership of 6,063,500, or about 20,700 per weekday as of the second quarter of 2026.

Metrolink connects with Los Angeles County's Metro Rail and Metro Busway systems, North County Transit District's Coaster commuter rail and Sprinter hybrid rail services, and with Amtrak's Pacific Surfliner, Coast Starlight, Southwest Chief, Sunset Limited, and Texas Eagle inter-city rail services. Metrolink owns several hundred miles of track and also operates over track shared with freight railroads and other public agencies.

The system, founded in 1991 as the Southern California Regional Rail Authority (SCRRA) and adopting "Metrolink" as its moniker, started operation in 1992. Average weekday ridership was 42,928 as of 2017. The SCRRA contracts with Alstom both to operate the trains and to maintain the rolling stock (locomotives and passenger cars).