Pulichinthala Project

Pulichintala Project
Pulichinthala Dam
Pulichintala Project is located in Andhra Pradesh
Pulichintala Project
Pulichintala Project
Location within Andhra Pradesh
Official nameK.L Rao Sagar
CountryIndia
LocationPulichintala village, Bellamkonda, Palnadu district, Andhra Pradesh
Coordinates16°45′15″N 80°03′24″E / 16.75417°N 80.05667°E / 16.75417; 80.05667
PurposeIrrigation & Water supply
Construction began08 August 2009
Opening date7 December 2013
Construction cost1850 crore rupees
OwnerGovernment of Andhra Pradesh
OperatorAndhra Pradesh
Dam and spillways
ImpoundsKrishna River
Height42.24 m (138.6 ft)
Length2,922 m (9,587 ft)
Width (base)31 m (102 ft)
Spillway typeControlled
Spillway capacity10 lakh cusecs
Reservoir
CreatesPulichinthala Reservoir
Total capacity46 Tmcft
Active capacity36.23 Tmcft
Catchment area240,732 km2
Surface area144 km2
Power Station
OperatorAPGENCO
Commission dateSeptember 22, 2016 (2016-09-22)
Hydraulic head25 Meters
Turbines4 × 30 MW Kaplan turbine
Installed capacity120 MW
Website
irrigationap.cgg.gov.in/wrd/dashBoard
Dr. KL Rao Sagar Pulichinthala Project entrance
Project entrance

The Pulichintala Project is a multi-purpose water management project for irrigation, hydropower generation, and flood control in the state of Andhra Pradesh, India, named after the prominent civil engineer, Kanuri Lakshmana Rao. It is a crucial irrigation facility for farmers in four coastal districts: West Godavari, Krishna, Guntur, Palanadu, and Prakasam, covering over 13 lakh acres. It has 24 gates and a balancing reservoir with a capacity of 46 Tmcft at 175 feet (53 m) MSL full reservoir level (FRL).