Poligon (İzmir Metro)
Poligon | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
An Evka 3-bound train at the station. | |||||||||||
| General information | |||||||||||
| Location | İnönü Cd., Güzelyalı Mah., 35140 Konak | ||||||||||
| Coordinates | 38°23′36″N 27°05′06″E / 38.3932°N 27.0850°E | ||||||||||
| System | İzmir Metro rapid transit station | ||||||||||
| Owner | İzmir Metropolitan Municipality | ||||||||||
| Operator | İzmir Metro A.Ş. | ||||||||||
| Line | |||||||||||
| Platforms | 2 side platforms | ||||||||||
| Tracks | 2 | ||||||||||
| Connections | |||||||||||
| Construction | |||||||||||
| Parking | No | ||||||||||
Cycle facilities | No | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | 26 July 2014 | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Poligon is an underground station on the M1 Line of the İzmir Metro in Konak. Located under İnönü Avenue, it consists of two side platforms servicing two tracks. Connection to ESHOT bus service is available at street level.
Poligon was opened on 26 July 2014, along with Fahrettin Altay, and marked the completion of the much delayed westward extension from Üçyol to Fahrettin Altay, which had been under construction since 2005.