İzmir Metro

İzmir Metro
Çankaya station of the İzmir Metro
Çankaya station of the İzmir Metro
Overview
Native nameİzmir Metrosu
Ownerİzmir Metropolitan Municipality
Localeİzmir, Turkey
Transit typeLight metro
Number of lines
1 (1 under construction)
Number of stations
24
Daily ridership
173,000
Chief executive
Ahmet Sinan Karakuzu
HeadquartersHalkapınar
Websiteİzmir Metro
Operation
Began operation
22 April 2000 (22 April 2000)
Operatorİzmir Metro A.Ş.
Number of vehicles
182
Train length120 metres (393 ft 8 in)
Headway4 min - Peak Hours 10 min - Max. Wait Time
Technical
System length27 km (17 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
75 metres (246 ft 1 in)
Electrification750 V DC Third rail, bottom contact
Average speed42 km/h (26 mph)
Top speed90 km/h (56 mph) (designed)
80 km/h (50 mph) (maximum permitted)
System map

The İzmir Metro (Turkish: İzmir Metrosu) is a light metro system serving the city of İzmir, Turkey. The current system, consisting of one line, starts from Narlıdere Kaymakamlık station in the southwestern portion of the metropolitan area and runs towards northeast to end at Evka-3 in Bornova. İzmir's metro line is 27 kilometres (17 mi) long, and serves 24 stations as of 4 March 2024.. The most recent expansion of the system was the Narlıdere extension, a 7.2-kilometre, seven-station westward extension from Fahrettin Altay, financed in part by the European Bank for Reconstruction and Development. Construction began on 9 June 2018, with completion originally expected by December 2021. The first six stations opened on 24 February 2024, with the final station, Narlıdere Kaymakamlık, opening on 4 March 2024 after nearly six years of construction. A second line, the M2 (Üçyol to Fuar İzmir), is currently under construction with 14 stations across 17.8 kilometres and is expected to open in 2027, with a projected daily ridership of 400,000 passengers.