Patterson railway station

Patterson
Southbound view from Platform 3, January 2026
General information
LocationNorth Avenue,
Bentleigh, Victoria 3204
City of Glen Eira
Australia
Coordinates37°55′29″S 145°02′07″E / 37.9248°S 145.0354°E / -37.9248; 145.0354
SystemPTV commuter rail station
OwnerVicTrack
OperatorMetro Trains
LineFrankston
Distance17.39 kilometres from
Southern Cross
Platforms3 (1 side, 1 island)
Tracks3
Construction
Structure type
Elevated
Parking48
Cycle facilities
Yes
AccessibleYes—step free access
Other information
StatusOperational, unstaffed
Station codePAT
Fare zoneMyki zone 1/2
WebsitePublic Transport Victoria
History
Opened28 May 1961 (1961-05-28)
Rebuilt28 June 1987
ElectrifiedJune 1922 (1500 V DC overhead)
Passengers
2005-2006162,671
2006-2007178,895 Increase 9.97%
2007-2008209,178 Increase 16.92%
2008-2009225,000 Increase 7.56%
2009-2010238,000 Increase 5.78%
2010-2011243,606 Increase 2.35%
2011-2012243,577 Decrease 0.011%
2012-2013Not measured
2013-2014211,000 Decrease 13.37%
2014-2015247,530 Increase 17.31%
2015-2016307,635 Increase 24.28%
2016-2017313,551 Increase 1.92%
2017-2018357,657 Increase 14.07%
2018-2019354,250 Decrease 0.95%
2019-2020249,700 Decrease 29.5%
2020-2021127,150 Decrease 49.1%
2021–2022144,800 Increase 13.88%
Services
Preceding station Railways in Melbourne Metro Trains Following station
Bentleigh Frankston line Moorabbin
towards Frankston
Track layout
Elster Creek branch
1
3
2
Location

Patterson station is a railway station operated by Metro Trains Melbourne on the Frankston line, part of the Melbourne rail network. It serves the south-eastern suburb of Bentleigh, in Melbourne, Victoria, Australia.

Patterson station is a ground level unstaffed station, featuring three platforms, an island platform with two faces and one side platform. It opened on 28 May 1961, with the current station provided in 1987. While the station had been proposed in 1930s demands from local residents intensified throughout the 1950s.

Named after Patterson Road, which is located immediately south of the station and also provides access, construction of the station commenced in 1958. An island platform was provided, and provision made for another platform face on the eastern side of the station. A photo taken by Weston Langford(1941-2014) on the day prior to the official opening clearly shows the new "middle" line about to be connected (see below), and the easternmost line removed shortly afterwards. There was also a signal box located at the eastern side (down line) that has since been removed. On 28 June 1987, a third track was provided between Caulfield and Moorabbin, and platform 3 was constructed on the eastern side.

On 17 December 1994, a deliberately lit fire damaged parts of the station.