Frankston railway station

Frankston
Northbound view from Platform 3, December 2025
General information
LocationYoung Street,
Frankston, Victoria 3199
City of Frankston
Australia
Coordinates38°08′35″S 145°07′34″E / 38.143°S 145.126°E / -38.143; 145.126
SystemPTV commuter rail station
OwnerVicTrack
OperatorMetro Trains
Lines
Distance43.92 kilometres from
Southern Cross
Platforms3 (1 island)
Tracks6
Connections
Construction
Structure type
Ground
Parking413
Cycle facilities
Yes
AccessibleYes—step free access
Other information
StatusOperational, premium station
Station codeFKN
Fare zoneMyki zone 2
WebsitePublic Transport Victoria
History
Opened1 August 1882 (1882-08-01)
Rebuilt1985–1987
18 June 2018
ElectrifiedAugust 1922 (1500 V DC overhead)
Passengers
2005–20061,806,560
2006–20071,967,223 Increase 8.89%
2007–20082,503,362 Increase 27.25%
2008–20093,129,943 Increase 25.03%
2009–20102,566,588 Decrease 17.99%
2010–20112,766,161 Increase 7.77%
2011–20122,474,406 Decrease 10.54%
2012–2013Not measured
2013–20141,672,074 Decrease 32.42%
2014–20151,535,028 Decrease 8.19%
2015–20161,555,049 Increase 1.3%
2016–20171,363,711 Decrease 12.3%
2017–20181,206,185 Decrease 11.55%
2018–20191,296,504 Increase 7.48%
2019–2020896,100 Decrease 30.88%
2020–2021576,400 Decrease 35.67%
2021–2022692,750 Increase 20.18%
2022–20231,022,400 Increase 47.58%
2023–2024997,450 Decrease 2.44%
2024–20251,035,450 Increase 3.81%
Services
Preceding station Railways in Melbourne Metro Trains Following station
Kananook Frankston line Terminus
Terminus Stony Point line Leawarra
towards Stony Point
Track layout
2
1
3
Location

Frankston station is a railway station operated by Metro Trains Melbourne and the terminus of the Frankston and Stony Point lines, part of the Melbourne rail network. It serves the south-eastern suburb of Frankston, in Melbourne, Victoria, Australia and neighbouring suburbs.

The station opened on 1 August 1882. It features two side platforms, a terminus platform at Platform 1 and having Platform 2 for the terminus platform at the northern end of the platform and the diesel Stony Point line services at the southern end. Its current form was constructed and completed in 2018.