Paris Metro Line 4

Line 4
Paris Metro Line 4
Overview
TerminiPorte de Clignancourt
Bagneux-Lucie Aubrac
Connecting linesParis Metro Paris Metro Line 1 Paris Metro Line 2 Paris Metro Line 3 Paris Metro Line 5 Paris Metro Line 6 Paris Metro Line 7 Paris Metro Line 8 Paris Metro Line 9 Paris Metro Line 10 Paris Metro Line 11 Paris Metro Line 12 Paris Metro Line 13 Paris Metro Line 14
RER RER A RER B RER C RER D RER E
Transilien Transilien Line H (Paris-Nord) Transilien Line K (Paris-Nord) Transilien Line N (Paris-Montparnasse) Transilien Line P (Paris-Est)
Tramways in Île-de-France Île-de-France tramway Line 3a Île-de-France tramway Line 3b
Stations29
Service
SystemParis Métro
OperatorRATP
Rolling stockMP 89CA
(21 trains in operation as of 5 June 2023)
MP 05
(11 trains in operation as of 10 February 2023)
MP 14
(20 trains in operation as of 18 March 2025)
Ridership167,000,000 (avg. per year)
2nd/16
History
Opened21 April 1908 (21 April 1908)
Technical
Line length13.9 km (8.6 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
between roll ways
Electrification750 V DC, guide bars on either side of the track
Conduction systemAutomated (SAET)
Route map
Saint-Ouen shops
Porte de Clignancourt
Tramways in Île-de-FranceÎle-de-France tramway Line 3b
Simplon
Marcadet–Poissonniers
Paris MetroParis Metro Line 12
Château Rouge
Barbès–Rochechouart
Paris MetroParis Metro Line 2
Gare du Nord
Paris MetroParis Metro Line 5 RERRER BRER DRER E TransilienTransilien Line H (Paris-Nord)Transilien Line K (Paris-Nord) TER Hauts-de-France Gare du Nord
Gare de l'Est
Paris MetroParis Metro Line 5Paris Metro Line 7 TransilienTransilien Line P (Paris-Est) TER Grand Est Gare de l'Est
Château d'Eau
Strasbourg–Saint-Denis
Paris MetroParis Metro Line 8Paris Metro Line 9
Réaumur–Sébastopol
Paris MetroParis Metro Line 3
Étienne Marcel
Les Halles
RERRER ARER BRER D
Châtelet
Paris MetroParis Metro Line 1Paris Metro Line 7Paris Metro Line 11Paris Metro Line 14
Cité
Saint-Michel
RERRER BRER C
Odéon
Paris MetroParis Metro Line 10
Saint-Germain-des-Prés
Saint-Sulpice
Saint-Placide
Montparnasse–Bienvenüe Paris MetroParis Metro Line 6Paris Metro Line 12Paris Metro Line 13 TransilienTransilien Line N (Paris-Montparnasse) TER Centre-Val de LoireTER Normandie Gare Montparnasse
Vavin
Raspail
Paris MetroParis Metro Line 6
Denfert-Rochereau
Paris MetroParis Metro Line 6 Denfert-Rochereau (Paris RER)RER B
Mouton-Duvernet
Alésia
Porte d'Orléans
Tramways in Île-de-FranceÎle-de-France tramway Line 3a
Original terminus
Mairie de Montrouge
Barbara
Bagneux–Lucie Aubrac
future Paris MetroParis Metro Line 15

Line 4 (French pronunciation: [liɲᵊ katʁᵊ]) is one of the sixteen currently opened lines of the Paris Métro, as well as one of its three fully automated lines. It connects Porte de Clignancourt in the north of Paris, to Bagneux-Lucie Aubrac in the eponymous southern suburban city, on a north-south axis across the French Capital. Held within the boundaries of the City of Paris for over a century – until its southern terminus was changed from Porte d'Orléans to Mairie de Montrouge in 2013 – the line was sometimes referred to as the Clignancourt – Orléans Line. At 13.9 km (8.6 mi) in length, it connects with all Paris Métro lines apart from the very short 3bis and 7bis branch lines, as well as with all 5 RER train lines. It also serves three of the Paris Railway stations, Gare du Nord, Gare de l'Est, and Gare Montparnasse.

Line 4 was the first line to connect to the south side of the River Seine, through an underwater tunnel built between 1905 and 1907. Line 4 long ran the longest-serving MP 59 rubber trains, which used rheostats to dissipate the braking power through resistance, making line 4 the hottest line in the system. Those trains were withdrawn from service on Line 4 during the course of 2011 and 2012 after 45 years (with some being in service for 50 years), yet remained another 12 years on in service on Line 11. On Line 4, they were replaced by the MP 89 CC stock transferred from Line 1, right after its automation.

In 2013, Line 4 was extended for the first time since its initial construction, into the southern suburbs of Montrouge. The line was further extended to Bagneux–Lucie Aubrac in 2022, connecting to the future Grand Paris Express. The line has been retrofitted for full automation, with the first automated trains commencing service on 12 September 2022.