Ontario Line

Ontario Line
Construction near Gerrard station site in April 2026
Overview
StatusUnder construction
OwnerMetrolinx
LocaleToronto, Ontario
Termini
Stations15
Service
TypeRapid transit
SystemToronto subway
Rolling stockHitachi Rail
History
Planned opening2032 (2032)
Technical
Line length15.6 km (9.7 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationOverhead line, 1,500 V DC
Operating speed80 km/h (50 mph)
Route map
Geographic Map of the Ontario Line and all connections. Map by OpenStreetMap.
Don Valley
Flemingdon Park
Maintenance and storage facility
Thorncliffe Park
Cosburn
Pape
Gerrard
Leslieville
East Harbour
Distillery District
Moss Park
Queen
Osgoode
Chinatown
King West
Milton, Kitchener,
and Barrie lines
Exhibition

Handicapped/disabled access All stations are accessible

The Ontario Line is a rapid transit line under construction in Toronto, Ontario, Canada. Fifteen new stations will be built along its 15.6-kilometre (9.7 mi) length, six of them connecting to other transit lines. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Don Valley station, where it will connect with Line 5 Eglinton. Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line.

The Ontario Line was announced by the Government of Ontario on April 10, 2019. Initially estimated to cost CA$10.9 billion with completion by 2027, the line was estimated in 2026 to cost around $34 billion with an estimated opening date in the early 2030s. A groundbreaking ceremony for the project took place on March 27, 2022. On April 20, 2026, tunnelling began using two tunnel boring machines.

Upon opening, the plan is for the line to be designated Line 3. This identifier was used by Line 3 Scarborough until its closure in July 2023.