GO Transit

GO Transit
Overview
OwnerMetrolinx
LocaleGreater Golden Horseshoe
Transit type
Number of lines
7 rail + 39 bus
Number of stations
71 rail
15 bus + numerous stops
Daily ridership
343,900 (weekdays, Q2 2026)
Annual ridership
79,165,600 (2025)
Key people
  • Michael Lindsay (President & CEO)
  • Martin Gallagher (COO)
HeadquartersToronto, Ontario, Canada
Websitegotransit.com
Operation
Began operation
May 23, 1967 (1967-05-23)
OperatorAlstom
Reporting marksGOTX
Infrastructure managers
Number of vehicles
  • 96 locomotives
  • 979 passenger coaches
  • 752 buses (269 single-level, 248 double-decker)
Technical
System length532.3 kilometres (331 mi) (rail)
2,776 kilometres (1,725 mi) (bus)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

GO Transit (pronounced "go") is a regional public transit system serving the Greater Toronto and Hamilton Area and the Greater Golden Horseshoe region of Ontario, Canada. With its hub at Union Station in Toronto, GO Transit's green-and-white trains and buses serve a population of more than seven million across an area over 11,000 square kilometres (4,200 sq mi), stretching from Stratford in the west to Peterborough in the east, and from Barrie in the north to Niagara Falls in the south. In 2025, the system had a ridership of 79,165,600. GO Transit operates diesel-powered double-decker trains and coach buses, on routes that connect with all local and some long-distance inter-city transit services in its service area.

GO Transit began regular passenger service on May 23, 1967, as a part of the Ontario Ministry of Transportation. Since then, it has grown from a single train line to seven commuter rail lines. GO Transit has been constituted in a variety of public-sector configurations. Today, it is an operating division of Metrolinx, a provincial Crown agency with overall responsibility for integrative transportation planning within the Greater Toronto and Hamilton Area and is projected to grow dramatically with electrification, increased frequency and new stations through GO Expansion, which is scheduled to be completed in phases through 2025–2032.