Nehru Park metro station
Nehru Park | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| General information | |||||||||||||||
| Location | Sastri Nagar, Chetpet, Chennai, Tamil Nadu 600031 | ||||||||||||||
| Coordinates | 13°04′44″N 80°15′00″E / 13.0787905°N 80.2500871°E | ||||||||||||||
| System | Chennai Metro station | ||||||||||||||
| Owner | Chennai Metro | ||||||||||||||
| Operator | Chennai Metro Rail Limited (CMRL) | ||||||||||||||
| Line | Green Line Inter Corridor Line | ||||||||||||||
| Platforms | Island platform Platform-1 → St. Thomas Mount Platform-2 → M.G.R Chennai Central | ||||||||||||||
| Tracks | 2 | ||||||||||||||
| Construction | |||||||||||||||
Structure type | Underground, Double Track | ||||||||||||||
| Depth | 18 metres (59 ft) | ||||||||||||||
| Parking | |||||||||||||||
Cycle facilities | Free bicycle | ||||||||||||||
| Accessible | Yes | ||||||||||||||
Architectural style | Chennai Metro | ||||||||||||||
| Other information | |||||||||||||||
| Station code | SNP | ||||||||||||||
| History | |||||||||||||||
| Opened | 15 May 2017 | ||||||||||||||
| Electrified | Single-phase 25 kV 50 Hz AC overhead catenary | ||||||||||||||
| Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
| |||||||||||||||
Nehru Park is an underground metro station on the South-East Corridor of the Green Line of Chennai Metro in Chennai, India. This was inaugurated on 14 May 2017. The station will serve the neighbourhoods of Egmore and Purasawalkam. The station has four entry and exit points.