Monon Corridor

Monon Corridor Monon Corridor
Monon Corridor crossing above Sibley Street, April 2026
Overview
LocaleLake County, Indiana, United States
Termini
Service
TypeCommuter rail
SystemSouth Shore Line
OperatorNICTD
Rolling stockNippon Sharyo NICTD EMUs
History
OpenedMarch 31, 2026 (2026-03-31)
Technical
Line length9 mi (14 km)
Number of tracks1 + passing sidings
Track gauge4 ft 8+1⁄2 in (1,435 mm)
ElectrificationOverhead line, 1,500 V DC
Route map
0
Millennium Station
UpperLeft arrow Metra│NICTD Up arrow
0.8 mi
1.3 km
Van Buren Street
1.4 mi
2.3 km
Museum Campus/​11th Street
2.2 mi
3.5 km
18th Street
(events only)
2.7 mi
4.3 km
McCormick Place
(events only)
I-55.svg I-55 (End)
7.0 mi
11.3 km
57th Street
14.5 mi
23.3 km
115th Street/​Kensington
(bypassed)
enlarge…
19.0 mi
30.6 km
Hegewisch
Up arrow
Monon Corridor to Chicago
(peak hours)
Lakeshore Corridor Lakeshore Corridor LowerRight arrow
20.7 mi
33.3 km
Hammond Gateway
enlarge…
Maintenance and storage facility
21.9 mi
35.2 km
Downtown Hammond
(planned)
24.1 mi
38.8 km
South Hammond
25.3 mi
40.7 km
Munster Ridge
UpperLeft arrow Amtrak to Chicago
CN South Bend Subdivision Right arrow
28.1 mi
45.2 km
Munster/Dyer
0.6 miles (1 km) to Dyer
Key
Monon Corridor
Lakeshore Corridor
Metra Electric District
Other lines

The Monon Corridor, also called the West Lake Corridor during project planning and construction, is a commuter rail line in Lake County, Indiana, that is part of the South Shore Line system. The line, which branches south from the main line at Hammond Gateway station along a single-track line, serves the municipalities of Hammond, Munster and Dyer. Trains run directly to Chicago during peak hours, while shuttle trains run between Hammond and Dyer during off-peak hours.

The Northern Indiana Commuter Transportation District (NICTD) began planning an extension of the South Shore Line to Valparaiso in 2006 due to population growth in Northwest Indiana. Plans were canceled in 2008 due to lower-than-expected ridership projections. The Indiana General Assembly approved funding for the branch in 2015, and the Federal Transit Administration awarded a grant to the line in 2019. Work started in October 2020, and the branch had its opening announced in the farewell letter from the retiring NICTD President for March 31, 2026.