Metrorrey Line 6

Line 6
Overview
StatusUnder construction
OwnerGovernment of the State of Nuevo León
LocaleMonterrey
Termini
Stations20 in total:
  • 15 under construction
  • 5 planned
Websitehttps://www.nl.gob.mx/?P=metrorrey_principal
Service
TypeMonorail
SystemMetrorrey
OperatorSistema de Transporte Colectivo Metrorrey
History
OpenedBy June 2026 (planned)
Technical
Line length26.9 km (16.7 mi) total
  • 26.9 km (16.7 mi) under construction
Route map
Aeropuerto
Hospital de zona 67 (postponed)
Parque industrial (postponed)
Apodaca centro
Concordia (postponed)
El Milagro
Julian Treviño
Isidoro Sepúlveda
opens 2027
opens June 2026
Yard Citadel
Citadel (postponed)
La Fé
La Talaverna (opens Dec. 2026)
San Rafael (opens Dec. 2026)
Bonifacio Salinas (opens Dec. 2026)
Libertad (opens Dec. 2026)
Linda Vista (opens Dec. 2026)
Churubusco
Y Griega
Parque Fundidora
opens June 2026
opens 2027
Santa Lucía
Ginecología
The picture shows the new Line 6 monorail under construction in Monterrey, Mexico, in May 2035. The picture, taken into the setting sun, shows support columns and an incomplete upper pair of guiderails for the future monorail system.
Monterrey Metro Line 6 monorail being constructed in May 2025

Metrorrey Line 6 is one of the three lines currently planned by Metrorrey, which will connect the municipalities of Monterrey, Guadalupe, San Nicolás de los Garza and Apodaca. It will have an extension of approximately 17.6 kilometers. It will connect with lines 3, 4 and 5 at the Saint Lucia station, in front of the High Specialty Medical Unit No. 33 of the Mexican Social Security Institute (IMSS). It connects to line 1 at the Y.A. station. Officially it does not have a distinctive color, but on the map, it is shown as purple.

On 29 April 2022, the Government of the State of Nuevo León launched an international public tender for the construction of the line. Construction work began on 11 February 2023. The second stage of the construction of 13.5 kilometers of lines 4 and 6 was expected to be completed on 30 November 2024. However, as of 29 May 2024, Lines 4 and 6 are now expected to be completed before the 2026 FIFA World Cup.

It will begin at the Hospital de Gynecología; in Monterrey, it continues along Avenida Constitución, Parque Fundidora, Prolongación Madero, Miguel Alemán Avenue, and ends in the center of the municipality of Apodaca.

Governor Samuel García has mentioned on several occasions an extension to the future that connects with Monterrey International Airport, located on the outskirts of the municipality of Apodaca.