Metrorrey Line 4

Line 4
Overview
StatusUnder construction
OwnerGovernment of the State of Nuevo León
LocaleMonterrey
Termini
  • Ginecología
  • Tren del Norte
Stations10 in total:
  • 7 under construction
  • 3 planned
Service
TypeMonorail
SystemMetrorrey
OperatorSistema de Transporte Colectivo Metrorrey
History
OpenedBy June 2027(planned)
Technical
Line length7.5 km (4.7 mi)
Track gaugeMonorail
Route map
Santa Lucía
Ginecología
Barrio Antiguo (postponed)
Macroplaza
Ponte del Papa
Pino Suárez
Serafin Peña (postponed)
Nuevo Edificio Fuerza Civil
Torre Rise
San Jeronimo (postponed)
Tren del Norte

Metrorrey Line 4 is an under-construction Metrorrey line that will serve the municipalities of Monterrey and San Pedro Garza García. The straddle-beam monorail will have an extension of approximately 7.5 kilometers with seven stations in the first phase and will connect with Line 6 at shared Ginecología station and with Line 3 at the Saint Lucia station (in front of the High Specialty Medical Unit No. 23 of the Mexican Social Security Institute).