Mandurah line

Mandurah line
Six car electric multiple unit train running on tracks within the median strip of a freeway
Overview
Other names
  • South West Metropolitan Railway
  • Southern Suburbs Railway (during construction)
OwnerPublic Transport Authority
LocalePerth and Mandurah, Western Australia
Termini
Continues fromYanchep line
Stations13
Service
TypeSuburban rail
SystemTransperth
OperatorPublic Transport Authority
Depots
Rolling stock
Ridership23,728,644 (year to June 2026)
History
Work began26 February 2004
Opened23 December 2007 (2007-12-23)
Technical
Line length70.8 km (44.0 mi)
Number of tracks2
CharacterAt-grade and underground
Track gauge1,067 mm (3 ft 6 in) narrow gauge
Electrification25 kV 50 Hz AC from overhead catenary
Operating speed130 km/h (81 mph)
SignallingFixed block signalling
Train protection systemAutomatic train protection
Route map
km
continues as Yanchep line
0.0
Perth Underground Transperth Transwa
0.6
Elizabeth Quay
7.2
Canning Bridge
11.7
Bull Creek
13.9
Murdoch
20.5
Cockburn Central
23.8
Aubin Grove
32.9
Kwinana
37.1
Wellard
43.2
Rockingham
47.5
Warnbro
64.4
Lakelands
70.8
Mandurah

Bus transfer
Bus connections at all stations

The Mandurah line is a suburban railway line in Western Australia that links Perth's central business district (CBD) with Mandurah to the south. Operated by the state's Public Transport Authority (PTA) as part of the Transperth system, the Mandurah line is 70.8 kilometres (44.0 mi) long and has thirteen stations. The line operates as a through service with the Yanchep line to the north, and includes two stations in the William Street tunnel under the CBD. It continues south via the Kwinana Freeway's median strip, where five of its stations are located, then diverges from the freeway for the southernmost six stations in the cities of Kwinana, Rockingham and Mandurah.

Known during planning and construction as the Southern Suburbs Railway or the South West Metropolitan Railway, early planning for the line began in 1989 during planning for the Yanchep line. In 1994, a route branching off the Armadale line at Kenwick to follow the Kwinana freight railway and Kwinana Freeway was selected, but after the election of a Labor state government in 2001, the planned route was changed to go via a tunnel under the CBD. The Mandurah line, which was built as part of the New MetroRail project, was divided into eight contract packages. It was designed similarly to the Yanchep line, using widely spaced stations with bus interchanges and large park-and-rides.

Construction began in February 2004; it was disrupted by labour strikes and technical issues, particularly on the CBD tunnel section. Originally planned to open between Perth and Warnbro station in 2006 and between Warnbro and Mandurah in 2007, the tunnel opened on 15 October 2007 and the rest of the line opened on 23 December 2007. The total cost of New MetroRail was A$1.725 billion. Two infill stations have since opened: Aubin Grove in April 2017 and Lakelands in June 2023. In June 2025, the Thornlie line was extended to Cockburn Central station on the Mandurah line, completing the Kenwick route that was planned before 2001.

B-series and C-series trains are the main rolling stock used on the Mandurah line, and A-series trains were also formerly common. Trains run at a fifteen-minute headway during most times, reducing to as short as a five-minute headway in peak periods, when some services terminate at Cockburn Central. The travel time from Perth to Mandurah is 54 minutes. Initial patronage has significantly exceeded forecasts. The line recorded 23,728,644 boardings in the year to June 2026, making it the busiest Transperth railway line.