MF 19

MF 19
MF 19 train arriving at Boulogne–Jean Jaurès on Line 10
In service
  • 2025 (Line 10)
  • Future
  • 2026 (Line 7bis)
  • 2027 (Line 3bis)
  • 2027 (Line 13)
  • 2028 (Line 12)
  • 2029 (Line 8)
  • 2031 (Line 3)
  • 2033 (Line 7)
ManufacturerAlstom
Family nameMetropolis
ReplacedMF 67, MF 77, MF 88
Constructed2022-Present
Entered service2025-Present
Number under constructionUp to 410 trains
Number built10 (3 prototypes)
Number in service6
Formation
  • 4-car sets (Lines 3bis and 7bis)
  • 5-car sets (Lines 3, 7, 8, 10, 12, 13)
OperatorRATP Group
Line servedParis Metro Paris Metro Line 3 Paris Metro Line 3bis Paris Metro Line 7 Paris Metro Line 7bis Paris Metro Line 8 Paris Metro Line 10 Paris Metro Line 12 Paris Metro Line 13
Specifications
Train length
  • 61 metres (200 ft)
  • 76 metres (249 ft)
  • 77.5 metres (254 ft)
Doors3 per side
Maximum speed70 km/h
Traction systemAlstom OptONIX IGBT-VVVF
Traction motors3-phase AC induction motor
Electric systemsThird rail, 750 V DC
Current collectionContact shoe
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The MF 19 (Métro Fer appel d'offres 2019; 2019 procurement rail metro) is a class of rolling stock on the Paris Metro. Being built by Alstom, it was ordered to replace existing trains on Lines 3, 3bis, 7, 7bis, 8, 10, 12 and 13, starting in 2025.

The MF 19 will come in two formations. Lines 3bis and 7bis will use 4-car trains, an upgrade from the current 3-car sets. Lines 3, 7, 8, 10, 12 and 13 will use 5-car sets. Up to 410 trains (2036 cars) are to be ordered, which by the mid 2030’s will be the most common train type in the system, running on nearly half of the lines of the Metro. The first MF 19 to enter service did so on October 16, 2025. The MF19 is scheduled to enter service on line 7bis at the end of 2026, and then on line 13 in the summer of 2027.