Line 8 (Ningbo Rail Transit)
| Line 8 | |||
|---|---|---|---|
Driver's cabin of Line 8 train | |||
| Overview | |||
| Status | Operational | ||
| Owner | Ningbo Rail Transit Group Co., Ltd | ||
| Locale | Ningbo, Zhejiang, China | ||
| Termini |
| ||
| Stations | 19 (18 in operation) | ||
| Service | |||
| Type | Rapid transit | ||
| System | Ningbo Rail Transit | ||
| Operator | Ningbo Rail Transit Group Co., Ltd | ||
| Depot(s) | Xiayingnan depot, Hongtang Parking Lot | ||
| Rolling stock | 23 CRRC Zhuzhou six-car type B trains adopt GoA4 automation level | ||
| History | |||
| Opened | 30 June 2025 | ||
| Technical | |||
| Line length | 21.8 km (13.5 mi) (in operation) 23.3 km (14.5 mi) (Phase 1 total) | ||
| Number of tracks | 2 | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | 1,500 V DC Overhead catenary | ||
| Operating speed | 80 km/h (50 mph) (Maximum design speed) | ||
| |||
The Line 8 of Ningbo Rail Transit (Chinese: 宁波轨道交通8号线) is a rapid transit line served Ningbo, Zhejiang, China.
Line 8 is built in accordance with the "Ningbo Urban Rail Transit Phase III Construction Plan (2021-2026)", along with Phase I of Line 6, Line 7; the western extension of Line 1, and the extension of Line 4. Total project investment is 19.9 billion RMB. On 5 January 2022, the first phase of Line 8 began construction. On 16 January 2025, Phase I of Line 8 begin trial operation. On 30 June 2025 at 10:00 am, the first phase of Line 8 from Kaiyuan Road to Hansong Road was officially put into operation. The first phase of Line 8 has a total length of 23.3 kilometers, and the entire line is fully underground, with a total of 19 stations.
Line 8 designed by Guangzhou Metro Design and Research Institute Co., Ltd.; Zhejiang Huazhan Research and Design Institute Co., Ltd.