Line 6 (Ningbo Rail Transit)
| Line 6 | |||
|---|---|---|---|
| Overview | |||
| Status | Operational | ||
| Owner | Ningbo Rail Transit Group Co.Ltd | ||
| Locale | Ningbo, Zhejiang, China | ||
| Termini |
| ||
| Stations | 23 | ||
| Service | |||
| Type | Rapid transit | ||
| System | Ningbo Rail Transit | ||
| Operator | Ningbo Rail Transit Group Co.Ltd | ||
| Depot(s) | Gaoqiao South Depot, Xinmian Parking Lot | ||
| Rolling stock | 37 Six cars type B train | ||
| History | |||
| Opened | 16 January 2026 | ||
| Technical | |||
| Line length | 39.6 km (24.6 mi) | ||
| Number of tracks | 2 | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | 1,500 V DC Overhead catenary | ||
| Operating speed | 100 km/h (62 mph) (Maximum design speed) | ||
| |||
The Line 6 of Ningbo Rail Transit (Chinese: 宁波轨道交通6号线) is a rapid transit line in Ningbo, Zhejiang. It starts from Gulin to Honglian with 23 stations in operation, spanning 39.6 km long. Construction started on 28 December 2022 with a total investment of 31.53 billion RMB.